My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/05/23
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/05/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:04 PM
Creation date
7/6/2018 10:21:41 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/23/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
5/23/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Directions to Contractor: <br /> 1. Remove two trees that had been marked to save along the ditch near the <br /> bridge crossing. Grade as necessary near no. 1 forward tee to save the two <br /> existing trees. Relocate the bridge crossing from the clubhouse to no. 1 tees <br /> - centered between back tee and back of middle tee. <br /> 2. Remove approximately 5 trees to the left of no. 8 fairway (poplars).. <br /> 3. WGA will look at a revised tee location for no. 7 tee to save the existing ash <br /> tree. <br /> 4. Mentioned to Randy that he should coordinate the utility connections to the <br /> buildings with the building contractor. <br /> Respectfully yours, <br /> Paul Miller, of Course Architect <br /> cc: Randy Dryden, Veit Companies <br /> Jerry Rachel, Veit Companies <br /> Note: Please make corrections or additions below and return to Williams, Gill so <br /> that this report may be amended. <br /> " LL- <br /> 2 Williams, Gill & Associates, Golf Course Architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.