My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-03-1993 WS
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
05-03-1993 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:44 PM
Creation date
7/9/2018 6:11:55 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/3/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
5/3/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL CONSIDERATION Agenda Section: 6. <br /> STAFF REPORT Report Number: 93-493WS <br /> AGENDA SESSION DATE May 3. 1993 Report Date: 4-29-91 <br /> DISPOSITION <br /> Item Description: Discussion Regarding City Hall Entrance <br /> Administrator's Review/Recommendation: <br /> - No comments to supplement this report <br /> - Comments attached. <br /> Explanation/Summary (attach supplement sheets as necessary.) <br /> PUMMABY; <br /> The remodeling of the front entry with an expanded "solarium" entrance will <br /> require the removal of some of the concrete walk. This could be 'patched <br /> back' or this may be the time to review the entire entry area. The current <br /> lights have created numerous problems over the last year and currently are <br /> temporarily wired. The concrete walk is panels of exposed aggregate that <br /> is difficult to clean of ice and snow. Because of the irregularities of the <br /> surface, ice does not "pop off" when shovelling. A great deal of salt is <br /> needed and in extreme temperatures the salt does not work, leaving patches <br /> of ice. The irregular surface also causes damage to ladies shoes and <br /> creates an unsafe surface for those wearing high heels. <br /> Staff is suggesting that this would be a good time to replace the concrete <br /> walk. The current walk is 33 feet wide, but this could be reduced as shown <br /> on the attached drawings to 16 feet in width. To replace the walk as is <br /> would cost approximately $1,400 in materials if put in by the City crew; <br /> the cost of the narrower walk would be $800 to $900. <br /> The existing lighting is old and unreliable. There are 3 alternatives to <br /> the lighting. First, similar lights with fiberglass poles could be <br /> installed at a cost of approximately $5, 000. Second, new decorative lights <br /> could be installed, this cost may be up to $8, 000. Third, the sidewalk pole <br /> lighting could be removed and replaced with roof top spots; this cost is <br /> estimated to be less than $2, 000, depending on circuitry. Staff is <br /> requesting Council direction on these issues. <br /> v �_ <br /> Ricinet r, DirectMor of Public Works/City Engineer <br /> RECOMMENDATION: <br />
The URL can be used to link to this page
Your browser does not support the video tag.