Laserfiche WebLink
3/92 <br /> s <br /> Table 3.5 (Cont. ) <br /> SUBWATERSHED TIME <br /> DESIGNATION PRIORITY CORRECTIVE ACTION TABLE COST * <br /> 4rEW-6 Low Feasibility study to 1996 5,000 <br /> determine type of deten- <br /> tion area and land <br /> acquisition needs. <br /> Detention area is <br /> located between Old <br /> Highway 10 and Bronson <br /> Drive east of Edgewood <br /> Drive. Multi-purpose <br /> detention area proposed <br /> in SEH study "Edgewood <br /> District Drainage Plan" <br /> (1988) . <br /> EW-3 Future 15-inch outlet pipe (F) 2,000 <br /> from the wetland to be <br /> built with reconstruction <br /> of County Road H2. <br /> EW-4 Future Feasibility study and (F) 33,000 <br /> construction of sedi- <br /> ment pond at west end <br /> of Silverview Pond. <br /> EW-4 Future Sediment removal at (F) 5,000 <br /> west leg of Silverview <br /> Pond. <br /> EW-6 Future Construct detention (F) 170,000 <br /> pond between Bronson <br /> Drive and Old Highway 10 <br /> east of Edgewood Drive. <br /> EW-8 Future Trunk storm sewer from (F) 100,000 <br /> EW-6 (Old Highway 10 and <br /> County Road H2) to EW-8 <br /> (Long Lake Road and <br /> County Road H2) . (May be <br /> part of County Road H2 <br /> storm sewer or as proposed <br /> in 1988 SEH report "Edge- <br /> wood District Drainage <br /> Plan. " ) <br /> • <br /> 3.2 - 6 <br />