My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/11/09
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/11/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:00 PM
Creation date
7/9/2018 6:37:27 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/9/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
11/9/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC/6//G/f00% <br /> Agenda Section: <br /> 'MOS REQUEST FOR COUNCIL CONSIDERATION Report Number: <br /> STAFF REPORT Report Date: <br /> Council Action: <br /> 410 November 9, 1992 ❑ Special Order of Business <br /> CI'T'Y COUNCIL MEETING D• ❑ Public Hearings <br /> ❑ Consent Agenda <br /> ❑ Council Business <br /> Item Description: Water Filtration Equipment <br /> Additional Information <br /> Administrator's Review/Recommendation: <br /> - No comments to supplement this report <br /> - Comments attached. <br /> Explanation/Summary (attach supplement sheets as necessary.) <br /> KUMMARY; <br /> Staff has reviewed the bids, specifications and estimated in- <br /> stallation costs for the remodeling of water filtration plant #2 • <br /> and plant #3 . The quoted cost of the filter equipment is <br /> $437,680 , the estimated cost of the backwash reclaim tanks and <br /> installation of the equipment is $288 , 320. Building renovation <br /> costs are estimated to be $164,700 . the total cost for the 2 <br /> plants is $890 ,700. The budgeted cost for remodeling the 2 treat- <br /> ment plants is $500,000. Therefore, the proposed remodeling would <br /> be over budget by $390,700. <br /> • At this time staff is reviewing the available funds for this <br /> project. There does not appear to be sufficient funds to complete <br /> the project as proposed. The options are to remodel the existing <br /> equipment to accommodate reclaiming backwash water, possibly <br /> automating some plant controls, and provide automation if possi- <br /> ble. <br /> In discussing the possibility of remodeling the existing equip- <br /> ment with SEH, the consulting engineer, staff became aware that <br /> Hudson, Wisconsin is modifying their existing equipment and <br /> apparently achieving reasonable filtration efficiencies. There- <br /> fore, staff is recommending that review of the Hudson filter <br /> plant be conducted prior to making •any decision regarding filter <br /> plant #2 and plant #3. <br /> • <br /> Ric inetor <br /> City Engineer/Director of Public Works <br /> 010 <br /> r,COMMENDATION; <br /> Start recommelAs rescheduling the award of the bid for filtration <br /> equipment to tIlle Novem,6er 23, 1992 Council meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.