Laserfiche WebLink
• <br />EXAMPLES OF PROJECTS THAT WOULD BE FUNDED IN <br />THE 5 YEAR PLAN <br />• Cleaning and maintenance of wetlands and their outlets <br />• Curb and gutter, storm sewer and catch basin costs <br />associated with street improvement projects <br />• Maintenance and repair of the existing infrastructure <br />• Removal of sediment accumulation in existing wetlands <br />and sedimentation ponds <br />Regular maintenance strategy such as street sweeping, <br />catch basin cleaning, and inspection of the drainage <br />system <br />• Ditch cleaning and repair <br />• Administration related to water resources issued in the <br />city <br />• Feasibility studies for drainage improvements <br />• Drainage system improvement projects <br />There are many steps during the Plan Process for Public Input: <br />• During the Approval Process of a Specific Project <br />• Annual Budget Cycle <br />• Plan Amendments <br />