Laserfiche WebLink
STAGE TWO OUTSIDE - to be accomplished between October 1993 and <br /> December 1994 . <br /> 1) new freestanding sign <br /> 2) flag pole on building <br /> 3) install flower beds (petunias) on boulevards <br /> 4) redesign and replace concrete apron <br /> 5) add new wheelchair access <br /> 6) install trees and flowers per the landscaping plan received <br /> December 21, 1992 and referenced in the attached resolution as <br /> Exhibit 2 <br /> STAGE THREE INSIDE - to be accomplished in 1995. <br /> 1) complete purchase of new furnishings <br /> STAGE THREE OUTSIDE - to be accomplished in 1995 . <br /> 1) remove bituminous form north side of building and out back to <br /> grass <br /> 2) resurface parking lot from rear of building forward excluding <br /> rear lot <br /> 3) build airlock entry at building front <br /> 4) replace awning cover <br /> 5) install shrubs on north side of building (after bituminous is <br /> removed) , per the landscaping plan received December 21, 1992 <br /> and referenced in the attached resolution as Exhibit 2 <br /> All repairs and improvements to be in compliance with existing city <br /> codes . Repairs to be performed by the owner or licensed contractors <br /> when required. <br />