Laserfiche WebLink
Development Cost Schedule <br />Mounds View Golf Links & Practice Center • City of Mounds View <br />October 4, 1993 <br />C---------- <br />1 9 Hnle Golf Course <br />2 1.0 - General <br />3 1.1 Site Preparation & Stan -up <br />p 1.2 Clearing & Grubbing <br />5 1.3. Erosion Control <br />6 Sub -Total this Part <br />7 <br />8 12.0 • Excavation, Grading & Shaping <br />2.1 Topsoil Stripped & Replaced <br />1 0 .. 2.2 Rough Grading ,& Shaping <br />1? 2.3, Pond Excavation & Placement <br />12 Sub -Total this Part <br />1 31 <br />1 413.0 - Drainage <br />1 5 3.1 Subsurface drainage <br />1 6 3.2 Small diameter drainage piping <br />171 3.3 Culvert & Large Diameter Piping <br />18 Sub -Total this Part <br />191 <br />20'4.0 - Finish Work <br />p 1 , 4.1 Greens Construction 10 a 5.500 sq. it each <br />22 4.2 Tees Construction 9 @ 7.000 sq. It. each <br />23 '1 4.3 Bunker Construction 15 a 1.500 sq. ft. each <br />24 Sub -Total this Part <br />25 <br />• 2 6 5.0 Irrigation <br />275.1 Water Supply Connections/Improvements <br />2 8 ' 5.2 Well <br />_2_9 5 3 500 GPM Pumping Station <br />3 0 5.4 Pump House Building (12' x 18') <br />31 5.5 Electrical Service & Building Wiring <br />32 ; 5.6 9 Hole Automatic Single Row System <br />33, Sub -Total this Part <br />341 <br />3 5�6.0 - Finish Work <br />3 61 6,1 Seed Bed Preparation <br />37 i 6.2 Fairway Seeding & mulching <br />__3 81 6.3 Rough SeedingtSprigging <br />39� 6.4 Greenitee seeding <br />4 0 6.5 Misc. Sodding <br />4 1 Sub -Total this Part <br />4 2' <br />43 7.0 Misc. Construction <br />44 7.1 Cart/Service paths <br />4 5: 7.2 Landscape Plantings <br />Williams. Gill & Associates • Goll Course Architects <br />D E <br />i LS <br />14 AC <br />1 LS <br />20,000.CY <br />35,000-Cy <br />7,500 Cy <br />3,000.IF <br />i.000 LF <br />500 LF <br />55.000 5: <br />63.000 9: <br />22.500 SF <br />1 LS <br />1 LS <br />1 LS <br />1 LS <br />1 LS <br />1 LS <br />F <br />$25,000.00; <br />$1.750.001_ <br />$Ltp,.uu�.up1 <br />_ $24,500.001 <br />$5,000.001 <br />S5,000.00 <br />--554,500_00, <br />$2.25; <br />545,000.00 <br />$1.251 <br />S43,750.00 <br />$3.001 <br />$22.500.00 <br />_51.11,250.00 <br />S4.50,_ SI3,500.001 <br />$1Y,00! 512,000.001 <br />$100.001 $50.000.001 <br />$75,,50.0.001 <br />$3.50. $192,500.001 <br />$0.75, $47.250.00 <br />S1.25 S28,125.00; <br />S267,875.00' <br />S2,500.00. <br />S25.000.00. <br />S35.000.00 <br />$6,000.00. <br />S5.000.00; <br />S55.000.00. <br />$2,500.00 <br />S25,000.00� <br />S25,000.00 <br />S6,000.00 <br />S5,000.00i <br />S55,000.001 <br />$118,500.0.01 <br />45 AC <br />S1,500.001 <br />S67,500.001 <br />35 AC <br />S850.00, <br />S29,750.001 <br />10 AC <br />S850.00 <br />$0.1.0: <br />S8,500.001 <br />S11,,200.001 <br />112.000 SF <br />15,000 Sy <br />51.50; <br />$22,500.00 <br />5139,450.001 <br />10,000 SF <br />$1.20 <br />$12,000.001 <br />0 LS <br />- <br />SO.o . <br />page 1 <br />