Laserfiche WebLink
TERMS AND CONDITIONS :7r AGREEMENT BETWEEN OWNER AND ARCHITECT <br />ARTICLE 1 <br />ARCHTECTS RESPONSIBILITIES <br />1.1 ARCHrTECTS SERVICES <br />1.1.1 The Architect's %mica mservicesmist of those services Per- <br />formed by the Architect, Architect's employ= and Architect's <br />consultants as enumerated In Ankles 2 and 3 of this Agreemem <br />and any other service Included In Article 12. <br />1.1.2 The Architect's services shall be performed a% apcdi* <br />Thusly at is consistent with professional skill <br />aml care and the <br />the Owner. the <br />orderly progress of the Work. Upon request <br />Architm shall submit for the owner's approval a schedule for <br />the performance of the Architect's services which may be <br />adjusted as the Project Proceeds, and shag Include allowances <br />for priiods of time required for the Owner's review and for <br />approval of submissions by authorities laving Jurisdiction over <br />the Project. Time limits established by this schedule appmved <br />by ft Owner shah our. [AqK for reasonable acre. be aacded <br />by the Architect or Owner. <br />1.1.3 The services covered by this Agreement are subject u7 <br />the time limitations contained in 5ubp=gmph 11.5.1. <br />ARTICLE 2 <br />SCOPE OF ARCHITECTS BASIC SERVICES <br />2.1 DEFINITION <br />2.1.1 The Architect's Basic Service consist of those dacriticd <br />in Paragraphs 2.2 through 2.6 and any other service identified <br />in Article 12 as Pan of Basic Services, and include normal stmo <br />coal, mechanical and electrical engineering.services. <br />2.2 SCHEMATIC DESIGN PHASE <br />2.2.1 T1re Architect shall review the program furnished by the <br />Owner to ascertain the requirements of the Project and %hail <br />arrive at a mutual understanding of such requirements with the <br />Owner. <br />2.2.2 The Architect shall provide a preliminary niltutk7n of <br />the Owner's program, schedule and construction budget <br />requirements, each in terms of the other, subject 10 the limita' <br />Lions set forth in Subparagraph 5.2. L <br />2.2.3 The Architect shall review with the Owner allemmive <br />approaches to design and eonsimctiun of the Protect. <br />2.2.4 Based on the mutually agiT.ed-upon pmftram, schedule <br />and construction budget requirements, the Architect shall <br />Prepare, for approval by the Owner. Schematic Design DOC11- <br />mcnts consisting of drawings and other documents illustrating <br />the scale and relationship of PIOIect components. <br />2.2.5 The Architect %hail submit to the Owner a preliminary <br />eitimatc of construction Cost based on current area, volume or <br />other unit costs. <br />schedule or consin7cdon budget, the Architect shill Prepare, <br />for appmval by die Owner, Design Development Documents <br />consisting of drawings and other rlocumenis 11 fts and describe <br />the sue and character of the PmJca 0 to architectural, sink• <br />total, mechanical and elocirioi systems, materials and such <br />other elements as may be appropriate. <br />2.3.2 The Architect shall advise the Owner of any adlustmenu <br />to the preliminary animate of Construction Cyst. <br />,. tar r rrw a a <br />2.4.1 geed on the approved Design Development Doco- <br />mrnts and any further odjustments in the scope or quality of <br />the Pmlcct or in the construction budget authorized by the <br />Owner, the Architect shag prepare, for approval by the Owocr, <br />Conslmction Documents consisting of Drawings and Sped6o- <br />tions setting forth in detail the requirements for the construe- <br />tion of the Protect. <br />2.4.2 The Architect shall Prepare <br />the necessary bidding information, bidding lotion, the Condi- <br />flons of the Contract, and the forth of Agreement between the <br />Owner and Contractor. <br />2.4.3 The Architect shag advise the Owner of any adjuslments <br />to previous preliminary estimates of Construction Craft Ind4 <br />aced by changes in requirements or general market conditkxu. <br />2.4.4 The Architect shall prepare and file for the Owner <br />documents required fix <br />the approval of govcmmental authorities having jutbdiction <br />Over the Project. <br />2.5 BIDDING OR NEGOTIATION PHASE <br />2.5.1 The Architect, following the Owner's approval of the <br />Construction Documents and of the latest preliminary estimate <br />of Construction Cult, shail assist the Owner in obtaining blots <br />or negotiated proposab and assist In awarding and preparing <br />contracts for construction. <br />2.6 DONSTRIICTOF THECO <br />NSTRUCTION TRUCTION CONON TRACT <br />PHASE —ADMINISTRATION <br />2.6.1 The Architect's responsibility to provide Basic Services <br />for the Comstmctkn Phase under this Agreement commences <br />with the award of the Contract for Construction and terminate <br />at the earlia of the issuance to the Owner of the final Certlfiate <br />for Payment or it <br />o(ihe.yPeek�:.k+sractendedander the+cNms oF5ttlParaS�PM <br />Ig:5,3- i7,P,l ;A ��;,,..,, ,. m-,tc r.•.•r-f G•It:,-frr, <br />2.3 DESIGN DEVELOPMENT PHASE <br />2.3.1 Used on the appmved Schematic Design Documents <br />and any adjustments authorized by the Owner In the program. <br />AU DOrUMM 0141 • Ow'NEK AKcI1f7ECr AGREEMt7n • 7011BTEE11111 E1111InN • AIA' • 01997 <br />TIIE AMEAIGAN IN%Tn UrEOE AaOfITECrS, 1775 NEV yOKK AVFNtIE. N W., wA%IIINGTON.O.C. ZOOM <br />B141.1987 2 <br />