My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/10/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/10/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:30 PM
Creation date
7/9/2018 7:54:16 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/11/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
10/11/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Article 12 <br /> 12.1 Scope of Architect's Services <br /> 12.1.1 The Architect is responsible for meeting only written Owner instructions, written <br /> design and construction criteria, written review comments, and written contract <br /> modifications; the Owner's Building Code; and the Owner's Zoning Ordinance. The Owner <br /> must notify the Architect in writing at the beginning of the Project of any other Owner <br /> requirements or regulations that apply to the Project. <br /> 12.1.2 Schematic Design Documents are not part of the Contract. The Owner has provided <br /> the building floor plan as shown on attached Exhibit 1. The Architect will base Design - <br /> Development on this sketch. We understand the Owner has reviewed the floor plan with <br /> the Building Inspector and that the Owner's floor plan meets all aspects of the building <br /> code. <br /> 12.1.3 Before proceeding to the succeeding phase of Basic Services, the Owner's written <br /> approval is required at: <br /> 1) Acceptance of Design Development Package <br /> 2) Acceptance of Final Plans and Specifications for Construction <br /> Documents Phase <br /> 12.1.4 During the phases of Basic Services identified in Sections 2.2 through 2.5, called <br /> "Design", Architect shall make not more than the following site visits for meetings with the <br /> Owner: <br /> 1) Design Development Phase 2 visits <br /> 2) Construction Documents Phase 2 visits <br /> 3) Bidding or Negotiation Phase 1 visit <br /> 12.2 Compensation <br /> . . or :asic ervices consis mg o lose a escrie. in ec ions roug ". <br /> ("Design"), Owner shall pay Architect the stipulated sum of ,:::. This is based on the <br /> floor plan as shown on Exhibit 1 plus the basement restrooms. Moveable partitions and <br /> furnishings are not part of the design. <br /> 12.2.2 The Design fee shall be divided among the phases for Basic Services as follows: <br /> Basic Services Phase Portion of Design Fee <br /> Design Development 30% <br /> Construction Documents . . . . . . . . . . . . . . . . 63% <br /> Bidding or Negotiation 7% <br /> TOTAL 100% <br /> gen/AIA/ 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.