Laserfiche WebLink
END S.P. 146-090-01STATION 91+18.70BEGIN S.P. 146-090-01STATION 1+55.90CITY OF MOUNDS VIEWRAMSEY COUNTY, MINNESOTACOUNTY ROAD 10 TRAIL SEGMENTS 1-5MINNESOTA DEPARTMENT OF TRANSPORTATIONCONSTRUCTION PLAN FOR: GRADING, AGGREGATE BASE, PLANT MIXED BITUMINOUS PAVEMENT, STORM SEWER, LIGHTING, LANDSCAPING ANDRELATED APPURTENANCESLOCATED ONCOUNTY ROAD 10FROMSILVER LAKE ROADTOCOUNTY ROAD HSTATE PROJECT NO. 146-090-01LENGTH AND DESCRIPTION BASED UPON PROPOSED TRAIL CENTERLINEI HEREBY CERTIFY THAT THE FINAL FIELD REVISIONS, IF ANY, OF THIS PLAN WERE MADE BYME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.11/19/2008 <br />2008 <br />COUNTY ROAD 10 TRAIL SEGMENTS 1-5 <br />MOUNDS VIEW, MN <br />82S.P.146-090-01MINN. PROJ. NO.ALL TRAFFIC CONTROL DEVICES AND SIGNING SHALL CONFORM AND BE INSTALLED IN ACCORDANCE WITH THE"MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MN MUTCD) AND PART VI, "FIELD MANUAL" FORTEMPORARY TRAFFIC CONTROL DEVICES --- GOVERNING SPECIFICATIONS ---THE 2005 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONFOR CONSTRUCTION" SHALL GOVERN.APPROVED:APPROVED:APPROVED:APPROVED:CITY OF MOUNDS VIEWRAMSEY COUNTY ENGINEERDISTRICT STATE AID ENGINEER: Reviewed for Compliance with State & Federal Aid Rules/PolicySTATE AID ENGINEER: Approved for State and Federal Aid FundingDATEDATEDATEDATEDATELIC. NO.CITY:MOUNDS VIEWCOUNTY:RAMSEYDISTRICT: METRODESIGN SPEED BASED ON STOPPING SIGHT DISTANCE:HEIGHT OF EYE = 4.5 ftHEIGHT OF OBJECT = 0.0 ftFUNCTIONAL CLASSDESIGN SPEEDBIKE TRAIL20 MPH8962.800.000.008962.801.7000.0000.0001.700GROSS LENGTHBRIDGE LENGTHEXCEPTION LENGTHNET LENGTHFEETFEETFEETFEETMILESMILESMILESMILESTEAX XXXX(XXX)PROJECT LOCATIONSHEET INDEX1TITLE SHEET2STATEMENT OF ESTIMATED QUANTITIES3-5TABULATIONS6EARTHWORK TABULATION & SUMMARY7SOILS AND CONSTRUCTION NOTES8TYPICAL SECTIONS9 - 15ALIGNMENT PLAN16 - 22REMOVAL PLAN23 - 35CONSTRUCTION PLAN36 - 37DRAINAGE PROFILES38DRAINAGE TABULATION39 - 40STORM WATER POLLUTION PREVENTION PLAN41 - 47CONTOUR & TEMPORARY EROSION CONTROL PLAN48 - 55PERMANENT EROSION CONTROL & LANDSCAPE PLAN56EROSION CONTROL DETAILS57 - 60ELECTRICAL DETAILS61 - 67LIGHTING PLAN68ELECTRICAL SYMBOLS69 - 72SIGN DETAILS73 - 82CROSS SECTIONSTHIS PLAN CONTAINS 82SHEETSSHEET NO.