My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2008/12/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2008
>
Agenda Packets - 2008/12/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:47 PM
Creation date
7/10/2018 12:02:56 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/22/2008
Supplemental fields
City Council Document Type
City Council Packets
Date
12/22/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
No.Item Units Qty EE Unit Price EE Total Price <br />229 21" RCP STORM SEWER, CLASS 4 LF 280 $40.00 $11,200.00 <br />230 24" RCP STORM SEWER, CLASS 4 LF 40 $50.00 $2,000.00 <br />231 CONNECT TO EXISTING STORM MANHOLE EA 5 $500.00 $2,500.00 <br />232 CONNECT TO EXISTING STORM SEWER EA 2 $500.00 $1,000.00 <br />233 CUT INTO EXISTING STRUCTURE EA 2 $1,000.00 $2,000.00 <br />234 2' X 3' STORM SEWER CB, INCL. R-3290-VB <br />CSTG AND CONC ADJ RINGS <br />EA 21 $1,400.00 $29,400.00 <br />235 4' DIA STORM SEWER CBMH, INCL. R-3290-VB <br />CSTG AND CONC ADJ RINGS <br />EA 7 $1,800.00 $12,600.00 <br />236 4' DIA STORM SEWER MH, INCL. R-1642-B <br />CSTG AND HDPE ADJ RINGS <br />EA 2 $1,800.00 $3,600.00 <br />237 CONSTRUCT 2' X 3' STORM SEWER CB OVER <br />EXISTING PIPE, INCL. R-3290-VB CSTG AND <br />CONC ADJ RINGS <br />EA 3 $1,800.00 $5,400.00 <br />238 CONSTRUCT 4' DIA STORM SEWER CBMH <br />OVER EXISTING PIPE, INCL. R-3290-VB CSTG <br />AND CONC ADJ RINGS <br />EA 6 $2,400.00 $14,400.00 <br />239 CONSTRUCT 4' DIA STORM SEWER MH OVER <br />EXISTING PIPE, INCL. R-1642-B CSTG AND <br />HDPE ADJ RINGS <br />EA 5 $2,400.00 $12,000.00 <br />240 RECONSTRUCT INVERT EA 1 $400.00 $400.00 <br />241 SEED AND HYDROMULCH SY 900 $5.00 $4,500.00 <br />$169,075.00 <br />$2,539,897.00 <br />$545,440.00 <br />$229,753.00 <br />$8,384.00 <br />$1,162,360.00 <br />$169,075.00 <br />TOTAL $4,654,909.00 <br />USE $4,655,000.00 <br />PART 6 - UTILITY IMPROVEMENTS (TYPE A <br />CONSTRUCTION) - STATE AID: <br />TOTAL PART 6 - UTILITY IMPROVMENTS (TYPE A <br />CONSTRUCTION) - STATE AID <br />TOTAL PART 1 - STREET IMPROVMENTS (TYPE A <br />CONSTRUCTION) <br />TOTAL PART 2 - UTILITY IMPROVMENTS (TYPE A <br />CONSTRUCTION) <br />TOTAL PART 3 - STREET IMPROVMENTS (TYPE B <br />CONSTRUCTION) - SILVER LAKE WOODS <br />TOTAL PART 4 - UTILITY IMPROVMENTS (TYPE B <br />CONSTRUCTION) - SILVER LAKE WOODS <br />TOTAL PART 5 - STREET IMPROVMENTS (TYPE A <br />CONSTRUCTION) - STATE AID <br /> 000435-07129-0 <br />© 2008 Bonestroo 10 ENGINEER'S ESTIMATE
The URL can be used to link to this page
Your browser does not support the video tag.