My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2016/04/04
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
Agenda Packets - 2016/04/04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:15 PM
Creation date
7/10/2018 12:10:30 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/4/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
4/4/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View <br /> <br /> <br />prior approval by the City with details provided by the designer. <br /> <br />(5) Specifications. Written specifications for land disturbance activities such as <br />product descriptions, installation and maintenance procedures required by the <br />applicant to carry out the project in accordance with this Chapter. <br /> <br />(6) Storm Wwater Pollution Prevention Plan (SWPPP) as required under the <br />National Pollution Discharge Elimination System (NPDES) Storm Wwater Permit <br />issued by the MPCA. The storm water pollution prevention plan SWPPP shall <br />consist of three (3) components, (1) a temporary erosion and sediment control <br />plan, (2) a permanent erosion and sediment control plan, and (3) a narrative. <br /> <br />(a) Temporary Erosion and Sediment Control Plan: Shall be <br />provided that indicates the location of perimeter controls, construction <br />fence, temporary sedimentation basins, inlet protection, areas to be <br />seeded, areas to be mulched or blanketed, location of construction <br />waste control (dumpsters, chemical storage, concrete washout, portable <br />restroom facilities, etc.) and all other required temporary erosion and <br />sediment control measures as described in the City of Mounds View <br />Land Disturbance and Implementation Requirements. This plan shall also <br />indicate staging of temporary erosion control measures. <br /> <br />(b) Permanent Erosion and Sediment Control Plan: Shall be provided that <br />indicates areas to be seeded and sodded, sediment ponds, storm sewer <br />systems and all other required permanent erosion and sediment control <br />measures. Permanent storm water pollution controls including, but not <br />limited to ponds, vegetated buffers and structural measures shall be <br />designed and constructed in accordance with other Chapters of the City <br />Code and requirements of other agencies having jurisdiction. <br /> <br />(c) Narrative: Shall be provided that describes, at a minimum, the <br />nature of construction activity, person(s) responsible for inspection and <br />maintenance of site erosion and sediment control including contact <br />information, project phasing, schedules, along with the timing, installation <br />and maintenance of erosion and sediment control measures and <br />specifications necessary to carry out the project. <br /> <br />Subd. 4. NPDES PERMIT DOCUMENTATION: The property owner’s agent shall apply <br />for and be issued a National Pollution Discharge Elimination System (NPDES) general <br />storm water permit from the Minnesota Pollution Control Agency (MPCA); and shall <br />submit to the City a copy of the MPCA Certificate of Permit Coverage. <br /> <br /> <br />1303.08: PERMIT REVIEW AND APPROVAL PROCESS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.