My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2016/04/04
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
Agenda Packets - 2016/04/04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:15 PM
Creation date
7/10/2018 12:10:30 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/4/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
4/4/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View <br /> <br /> <br />that causes erosion, scour or flooding of the site or receiving channels or a wetland. <br /> <br />d.e. Inspection. Inspection of the land disturbance plan measures will be carried out as <br />required by the City approved land disturbance permit conditions of approval and the City <br />of Mounds View Land Disturbance Plan and Implementation Requirements. All <br />stormwater management BMPs shall be inspected weekly or after every ½ inch rain event <br />by the applicant. Site inspections and record of rainfall events shall comply with the <br />NPDES Construction General Permit Part IV.E. <br /> <br />e.f. Maintenance. All erosion and sediment control measures must be maintained <br />throughout the duration of the project. Deficiencies found through inspection of a site shall <br />be repaired as necessary to bring the site into conformance with this Chapter, the plans and <br />specifications, the City of Mounds View Land Disturbance Plan and Implementation <br />Requirements and as set forth in the land disturbance permit conditions or approval, and <br />comply with the NPDES Construction General Permit Part IV.E . At minimum, land <br />disturbance plan items shall be maintained as follows: <br /> <br />(1) If a perimeter erosion control device is found to have sediment <br />accumulation in excess of one third (1/3) of the total device height, the <br />sediment shall be removed within twenty four (24) hours of discovery. <br /> <br />(2) If an erosion control device is found to be nonfunctional, it shall be repaired <br />or replaced within twenty four (24) hours of discovery. <br /> <br />(3) Temporary sediment basins shall be maintained when sediment reaches one <br />half (1/2) the outlet height or one half (1/2) the storage volume within seventy two <br />(72) hours after discovery. The use and management of site temporary sediment <br />basins shall meet the requirements of the NPDES Construction General Permit Part <br />III.C. <br /> <br />(4) Additional erosion and sediment control measures shall be installed as <br />directed by the City as found necessary to protect life and limb, the environment, <br />properties or the stability of a property until final stabilization, has been achieved. <br /> <br />f.g. Solid and Hazardous Materials. Management of site solid waste and hazardous <br />waste materials shall meet the requirements of the NPDES Construction General Permit <br />Part IV.F. <br /> <br /> <br />1303.09: ENFORCEMENT ACTIONS: <br /> <br /> <br />Subd. 1. RIGHT OF ENTRY: The applicant shall promptly allow the City and its <br />authorized representatives, upon presentation of credentials to: <br />
The URL can be used to link to this page
Your browser does not support the video tag.