Laserfiche WebLink
City of Mounds View <br /> <br /> <br />that causes erosion, scour or flooding of the site or receiving channels or a wetland. <br /> <br />d.e. Inspection. Inspection of the land disturbance plan measures will be carried out as <br />required by the City approved land disturbance permit conditions of approval and the City <br />of Mounds View Land Disturbance Plan and Implementation Requirements. All <br />stormwater management BMPs shall be inspected weekly or after every ½ inch rain event <br />by the applicant. Site inspections and record of rainfall events shall comply with the <br />NPDES Construction General Permit Part IV.E. <br /> <br />e.f. Maintenance. All erosion and sediment control measures must be maintained <br />throughout the duration of the project. Deficiencies found through inspection of a site shall <br />be repaired as necessary to bring the site into conformance with this Chapter, the plans and <br />specifications, the City of Mounds View Land Disturbance Plan and Implementation <br />Requirements and as set forth in the land disturbance permit conditions or approval, and <br />comply with the NPDES Construction General Permit Part IV.E . At minimum, land <br />disturbance plan items shall be maintained as follows: <br /> <br />(1) If a perimeter erosion control device is found to have sediment <br />accumulation in excess of one third (1/3) of the total device height, the <br />sediment shall be removed within twenty four (24) hours of discovery. <br /> <br />(2) If an erosion control device is found to be nonfunctional, it shall be repaired <br />or replaced within twenty four (24) hours of discovery. <br /> <br />(3) Temporary sediment basins shall be maintained when sediment reaches one <br />half (1/2) the outlet height or one half (1/2) the storage volume within seventy two <br />(72) hours after discovery. The use and management of site temporary sediment <br />basins shall meet the requirements of the NPDES Construction General Permit Part <br />III.C. <br /> <br />(4) Additional erosion and sediment control measures shall be installed as <br />directed by the City as found necessary to protect life and limb, the environment, <br />properties or the stability of a property until final stabilization, has been achieved. <br /> <br />f.g. Solid and Hazardous Materials. Management of site solid waste and hazardous <br />waste materials shall meet the requirements of the NPDES Construction General Permit <br />Part IV.F. <br /> <br /> <br />1303.09: ENFORCEMENT ACTIONS: <br /> <br /> <br />Subd. 1. RIGHT OF ENTRY: The applicant shall promptly allow the City and its <br />authorized representatives, upon presentation of credentials to: <br />