My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-06-2016 WS
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
09-06-2016 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:52 PM
Creation date
7/10/2018 12:23:50 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/6/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
9/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No. 4. <br />Meeting Date: September 5, 2016 <br />Type of Business: Work Session <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Director of Public Works /City Engineer <br />Item Title/Subject: Public Works Facility Design Update <br /> <br />Introduction <br />At the July 5, 2016 Work Session, staff and Oertel Architects reviewed the status of the design for the <br />new Public Works Facility. Since that time, the design has progressed and some of the comments at <br />the work session have been included in the work. During the work session staff will present the current <br />design along with an update on the current schedule and estimated cost for the facility. <br /> <br />Discussion <br />During the discussion in July, there was a comment regarding the view of the facility from Mounds View <br />Boulevard. Oertel Architects reviewed the orientation and, in conjunction with the staff, a slight <br />rearrangement of the building occurred. That change facilitated several improvements to the overall <br />site plan and building constructability. By adjusting the location of the administrative area, the existing <br />building will be able to remain in service for a much longer period during construction. The area serving <br />as a laydown/storage area is more compact which reduces the amount of paving and stormwater <br />management. Those items relate directly to cost savings for the project. <br /> <br />Staff has also undertaken a review of the regulated material within the building and at this point is <br />awaiting the results of additional testing on two samples that are above the level for asbestos <br />containing material. The additional testing may show that these materials can be treated as regular <br />demolition material should the additional testing show the content to be less than 1% asbestos. A final <br />report should be forth coming in early September. <br /> <br />One final item of note is that the geotechnical evaluation is nearly completed. WSB and Associates has <br />completed a number of borings around the site and is in the process of reviewing the infiltration <br />capability of the surrounding area. The final report will be forwarded to staff upon completion of this <br />work. <br /> <br />Respectfully Submitted, <br /> <br /> <br /> <br />Brian Erickson, P.E.
The URL can be used to link to this page
Your browser does not support the video tag.