<br /> DRAFT - Water Treatment System Needs Assessment
<br /> September 2016
<br />
<br />
<br />P05367-2015-000 51
<br />
<br />
<br />
<br />
<br /> I&C Control Panel Needs Figure 8.1
<br />
<br />Modifications to any of the three (3) water treatment facilities will require updates to achieve
<br />complete chemical code compliance. This should be kept in mind when choosing to accomplish
<br />any of the needed improvements. These three (3) observations were the main drivers to the
<br />implementation plan that was developed and included in Appendix I.
<br />8.2 Implementation Plan
<br />The main goal of the implementation plan is to accomplish the two main improvements listed
<br />above (WTP No. 2 rehabilitation and control panel replacement). Following those improvements
<br />WTP No. 3 rehabilitation and other various improvements were scheduled. These improvements
<br />are completely adjustable depending on the City of Mounds Views priorities and goals. They
<br />can also be spaced out more to accommodate funding coordination. In the current plan WTP No.
<br />2 and WTP No. 3 rehabilitations were spaced out to minimize budget issues and Mounds View
<br />staffing conflicts.
<br />
<br /> $ 153,000 $ 165,485 $ -
<br />Complete Panel Replacement Replace in 1-2 years $ 153,000 $ 165,485
<br /> $ 42,000 $ 3,245 $ 47,449
<br />PLC Replacement Replace in 5 years - Modifications in Existing Panel $ 33,000 $ 40,150
<br />Radio Replacement Replace in 5 years - Modifications in Existing Panel $ 3,000 $ 3,245
<br />OIT Installation Replace in 5 years - Modifications in Existing Panel $ 6,000 $ 7,300
<br /> $ 42,000 $ 3,245 $ 47,449
<br />PLC Replacement Replace in 5 years - Modifications in Existing Panel $ 33,000 $ 40,150
<br />Radio Replacement Replace in 5 years - Modifications in Existing Panel $ 3,000 $ 3,245
<br />OIT Installation Replace in 5 years - Modifications in Existing Panel $ 6,000 $ 7,300
<br /> $ 45,000 $ 48,672 $ -
<br />PLC Replacement Replace in 1-2 years - Modifications in Existing Panel $ 36,000 $ 38,938
<br />Radio Replacement Replace in 1-2 years - Modifications in Existing Panel $ 3,000 $ 3,245
<br />OIT Installation Replace in 1-2 years - Modifications in Existing Panel $ 6,000 $ 6,490
<br /> $ 58,000 $ 62,733 $ -
<br />Complete Panel Replacement Replace in 1-2 years $ 58,000 $ 62,733
<br /> $ 58,000 $ 62,733 $ -
<br />Complete Panel Replacement Replace in 1-2 years $ 58,000 $ 62,733
<br /> $ 41,000 $ 44,346
<br />Complete Panel Replacement Replace in 1-2 years $ 41,000 $ 44,346
<br /> $ 43,000 $ 46,509
<br />PLC Replacement Replace in 1-2 years - Modifications in Existing Panel $ 34,000 $ 36,774
<br />Radio Replacement Replace in 1-2 years - Modifications in Existing Panel $ 3,000 $ 3,245
<br />OIT Installation Replace in 1-2 years - Modifications in Existing Panel $ 6,000 $ 6,490
<br />482,000$ 436,966$ 94,899$
<br />Total Estimated Costs 2018 Budget 2021 Budget
<br />I&C Improvements
<br />Well No. 3 I&C Improvements
<br />WTP No. 1 I&C Improvements
<br />Well No. 1 I&C Improvements
<br />PROJECT
<br />WTP No. 1
<br />Well No. 2 I&C Improvements
<br />2 YEAR REPLACEMENT
<br />(2018)
<br />5 YEAR REPLACEMENT
<br />(2021)ASSESSMENT
<br />Public Works
<br />Well 6 and WTP I&C Improvements
<br />Booster Station
<br />I&C Improvements
<br />WTP No. 2
<br />Well 5 and WTP I&C Improvements
<br />WTP No. 3
<br />CONSTRUCTION COST
<br />(2016 Dollars)
|