Laserfiche WebLink
<br /> DRAFT - Water Treatment System Needs Assessment <br /> September 2016 <br /> <br /> <br />P05367-2015-000 51 <br /> <br /> <br /> <br /> <br /> I&C Control Panel Needs Figure 8.1 <br /> <br />Modifications to any of the three (3) water treatment facilities will require updates to achieve <br />complete chemical code compliance. This should be kept in mind when choosing to accomplish <br />any of the needed improvements. These three (3) observations were the main drivers to the <br />implementation plan that was developed and included in Appendix I. <br />8.2 Implementation Plan <br />The main goal of the implementation plan is to accomplish the two main improvements listed <br />above (WTP No. 2 rehabilitation and control panel replacement). Following those improvements <br />WTP No. 3 rehabilitation and other various improvements were scheduled. These improvements <br />are completely adjustable depending on the City of Mounds Views priorities and goals. They <br />can also be spaced out more to accommodate funding coordination. In the current plan WTP No. <br />2 and WTP No. 3 rehabilitations were spaced out to minimize budget issues and Mounds View <br />staffing conflicts. <br /> <br /> $ 153,000 $ 165,485 $ - <br />Complete Panel Replacement Replace in 1-2 years $ 153,000 $ 165,485 <br /> $ 42,000 $ 3,245 $ 47,449 <br />PLC Replacement Replace in 5 years - Modifications in Existing Panel $ 33,000 $ 40,150 <br />Radio Replacement Replace in 5 years - Modifications in Existing Panel $ 3,000 $ 3,245 <br />OIT Installation Replace in 5 years - Modifications in Existing Panel $ 6,000 $ 7,300 <br /> $ 42,000 $ 3,245 $ 47,449 <br />PLC Replacement Replace in 5 years - Modifications in Existing Panel $ 33,000 $ 40,150 <br />Radio Replacement Replace in 5 years - Modifications in Existing Panel $ 3,000 $ 3,245 <br />OIT Installation Replace in 5 years - Modifications in Existing Panel $ 6,000 $ 7,300 <br /> $ 45,000 $ 48,672 $ - <br />PLC Replacement Replace in 1-2 years - Modifications in Existing Panel $ 36,000 $ 38,938 <br />Radio Replacement Replace in 1-2 years - Modifications in Existing Panel $ 3,000 $ 3,245 <br />OIT Installation Replace in 1-2 years - Modifications in Existing Panel $ 6,000 $ 6,490 <br /> $ 58,000 $ 62,733 $ - <br />Complete Panel Replacement Replace in 1-2 years $ 58,000 $ 62,733 <br /> $ 58,000 $ 62,733 $ - <br />Complete Panel Replacement Replace in 1-2 years $ 58,000 $ 62,733 <br /> $ 41,000 $ 44,346 <br />Complete Panel Replacement Replace in 1-2 years $ 41,000 $ 44,346 <br /> $ 43,000 $ 46,509 <br />PLC Replacement Replace in 1-2 years - Modifications in Existing Panel $ 34,000 $ 36,774 <br />Radio Replacement Replace in 1-2 years - Modifications in Existing Panel $ 3,000 $ 3,245 <br />OIT Installation Replace in 1-2 years - Modifications in Existing Panel $ 6,000 $ 6,490 <br />482,000$ 436,966$ 94,899$ <br />Total Estimated Costs 2018 Budget 2021 Budget <br />I&C Improvements <br />Well No. 3 I&C Improvements <br />WTP No. 1 I&C Improvements <br />Well No. 1 I&C Improvements <br />PROJECT <br />WTP No. 1 <br />Well No. 2 I&C Improvements <br />2 YEAR REPLACEMENT <br />(2018) <br />5 YEAR REPLACEMENT <br />(2021)ASSESSMENT <br />Public Works <br />Well 6 and WTP I&C Improvements <br />Booster Station <br />I&C Improvements <br />WTP No. 2 <br />Well 5 and WTP I&C Improvements <br />WTP No. 3 <br />CONSTRUCTION COST <br />(2016 Dollars)