My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2015/01/05 (2)
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2015
>
Agenda Packets - 2015/01/05 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:45:46 PM
Creation date
7/10/2018 12:31:53 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/5/2015
Supplemental fields
City Council Document Type
City Council Packets
Date
1/5/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />202.08 202.08 (Rev. 5/10) <br /> <br /> <br />Subd. 3. Day Labor; Detailed Report: <br /> <br /> a. When the Council has performed construction work by day labor, it shall cause a <br />detailed report to be filed with the City Administrator and certified by the registered <br />engineer or other person in charge, if there is no registered engineer. The report shall <br />show: (Amended, Ord. 844, 5-20-10) <br /> <br /> (1) The complete cost of the construction. <br /> <br /> (2) Final quantities of the various units of work done. <br /> <br /> (3) Materials furnished for the project and the cost of each item thereof. <br /> <br /> (4) Cost of labor, cost of equipment hired and supervisory costs. <br /> <br /> b. The report shall have attached a certificate by the registered engineer or other <br />person in charge that the work was done according to the plans and specifications or, if <br />there were any deviations from them, an itemized statement of these deviations. <br /> <br />Subd. 4. Alternate Procedure on Street Improvements: As to any improvements consisting <br />of grading, graveling or bituminous surfacing of streets and alleys, the Council may <br />proceed in the manner provided in this Chapter; except, that it may: <br /> <br /> a. Order the work done by day labor, regardless of the estimated cost of such <br />improvements. <br /> <br /> b. Use Municipal equipment or hire equipment and purchase materials for all such <br />improvements to be done by day labor in any twelve (12) month period by advertising <br />once therefor, such advertisement to call for bids for the furnishing of equipment, if the <br />City does not use its own equipment, and for materials at unit prices based on the <br />quantities which the Council estimates will be required. <br /> <br /> c. Contract at one time on a unit-price basis for part or all of the street improvements <br />to be constructed by the Municipality during the current year, including improvements <br />which may thereafter be ordered constructed. <br /> <br />Subd. 5. Cooperation with State or Local Government: When an improvement is made <br />under a cooperative agreement with the State or another political subdivision by the terms <br />of which the State or other subdivision is to construct the improvement, it shall not be <br />necessary to comply with subdivisions 1 and 2 hereof. <br /> <br />City of Mounds View
The URL can be used to link to this page
Your browser does not support the video tag.