My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2015/01/05 (2)
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2015
>
Agenda Packets - 2015/01/05 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:45:46 PM
Creation date
7/10/2018 12:31:53 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/5/2015
Supplemental fields
City Council Document Type
City Council Packets
Date
1/5/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />202.09 202.09 (Rev. 2/00) <br /> <br /> <br />Subd. 2. The following are methods of street reconstruction and rehabilitation, which will be <br />utilized by the City of Mounds View in considering future projects and assessments. It <br />will be noted that the design standard for either reconstruction or rehab will be the current <br />design of the street section. Projects may be constructed to higher designs if warranted <br />and/or approved by the City Council. (Ord. 654, 2-14-00) <br /> <br /> Improvement Type and Apportionment of Cost: <br /> <br /> a. Street Reconstruction Including Curb and Gutter: The cost of street reconstruction <br />shall be recovered by the adjusted front footage method. The front footage rate shall be <br />determined by dividing the project cost by the total number of adjusted front feet in the <br />project area. The assessments per adjusted front foot may vary depending on the <br />underlying zoning of a parcel. Assessments for residential properties which are on <br />collector or arterial streets (MSA, county road) shall be assessed for one hundred percent <br />(100%) of the pavement surface and base, up to a width of twenty six (26) feet, equally <br />divided by both sides of the street. This amount shall not exceed fourteen dollars and <br />sixty cents ($14.60) per front foot. (Ord. 654, 2-14-00) <br /> <br />(1) Non-Collector Street Residential property owners will be assessed for the cost <br />of the pavement and base for the front footage side of the property, which shall not <br />exceed fourteen dollars and sixty cents ($14.60) per frontage foot. This amount will <br />be adjusted annually by resolution, in accordance with the Engineering News <br />Record (ENR). (Ord. 654, 2-14-00) <br /> <br />(2) Residents requesting Curb and Gutter, any required storm sewer and/or <br />installation of sidewalks/trails on a construction project will be assessed twenty five <br />percent (25%) of the total cost of the project additions which will include <br />engineering, additional removals, base and all other associated expenses. All <br />additional project requests shall be assessed at twenty five percent (25%) of the <br />total costs associated with the improvements. (Ord. 654, 2-14-00) <br /> <br />(3) One hundred percent (100%) of the turn back funds received from Ramsey <br />County will be applied to the new construction or pavement cost of the road that <br />was received. (Ord. 654, 2-14-00) <br /> <br /> The remaining cost shall be recovered by means of the general ad valorem property tax <br />paid by the entire community or by other funds that may become available to the City for <br />infrastructure cost recovery. (Ord. 654, 2-14-00) <br />City of Mounds View
The URL can be used to link to this page
Your browser does not support the video tag.