Item No. 2. <br />Meeting Date: September 8, 2015 <br />Type of Business: Work Session <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Public Works Director/City Engineer <br />Item Title/Subject: Space Needs for the New Public Works Facility <br /> <br />Introduction <br />The existing Public Works facility was constructed in the early 1960’s and expanded in the late <br />1980’s. This facility, although functional, is significantly undersized for the existing fleet and <br />staff that work out of this building. Some examples include an undersized maintenance bay, the <br />wash rack cannot be closed during washing operations, and a garage space is barely large <br />enough to contain the existing fleet. For example the jet-vac is blocked in such that a minimum <br />of 3 other pieces of equipment need to be moved to drive it out of the building. This increases <br />the response time in the event of an emergency. <br /> <br />Discussion <br />As a result, the current Capital Improvement Plan (CIP) contains an item for ‘Demo./Const. New <br />Public Works Maint. Facility.’ The design phase is scheduled to begin in 2016, with construction <br />scheduled in 2017. One of the keys to an economically successful design is being able to <br />clearly delineate the size of the facility to be constructed. By performing a space needs study <br />prior retaining a designer; the City of Mounds View will also have a better idea of size and cost <br />for the construction of a new facility. <br /> <br />The attached draft request for proposals presents a list of tasks that should be accomplished as <br />part of this study. These tasks include: <br />• Task 1 – Review existing facility and fleet. <br />• Task 2 – Prepare a draft study which includes a moderate future planning factor. <br />• Task 3 – Review the draft study with staff. The draft study will be presented at a City <br />Council work session. <br />• Task 4 – Finalize the study and provide final copies to the City. <br /> <br />A rough schedule for this project has been drafted and is shown below. <br />September 14, 2015 – City Council approves the Request for Proposals (RPF) for the <br />Space Study. <br />September 15, 2015 – Staff forwards the RFP to selected consultants. <br />September 30, 2015 – Consultants return RFP to the City. Staff reviews and will make a <br />recommendation for award. <br />October 12, 2015 – City Council approves selected consultant for award. <br />October 19, 2015 – Kick off meeting with consultant. <br />December 7, 2015 – Draft study presented to City Council for comment. <br />December 14, 2015 – Final study presented to City Council for approval. <br />