My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2015/11/02
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2015
>
Agenda Packets - 2015/11/02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:51 PM
Creation date
7/10/2018 12:50:04 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/2/2015
Supplemental fields
City Council Document Type
City Council Packets
Date
11/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2016 Fee Schedule Page 20 of 23 <br /> <br />VI. PUBLIC WORKS RELATED FEES <br /> <br />CALL-OUT RATE SCHEDULE (used for all hourly-based fees in this chapter) <br />Normal Business Hours for Call-out Rates 7:00 a.m. to 3:30 p.m., Monday thru Friday <br />Standard Call-out Rate: Specified time <br />conducted entirely within normal business <br />hours <br />$50 per hour specified <br />After-Hours Call-out Rate: Specified time <br />conducted outside normal business hours <br />$100 per hour specified <br />Holiday Call-out Rate: Specified time <br />conducted on holidays <br />$150 per hour specified <br />RIGHT-OF-WAY MANAGEMENT FEES (Chapter 910) <br />Excavation Permit Fees:* <br />Hole Fees: <br /> Boulevard Areas <br /> Pavement Areas <br />Underground Utility Work (requires Hole <br />Fee): <br /> OpenTrenching – Boulevard Areas <br /> Open Trenching – Pavement Areas <br />Trenchless Installation <br />Overhead Installation <br /> <br /> <br />$100 per hole excavated <br />$200 per hole excavated <br /> <br /> <br />$50 per 100 lineal feet or fraction thereof <br />$70 per 100 lineal feet or fraction thereof <br />$35 per 100 lineal feet or fraction thereof <br />$25 per 100 lineal feet or fraction thereof <br />Obstruction Permit Fees:* <br />Pavement Obstruction Fees: <br /> New Obstructions <br /> Replacing Existing Obstructions (in-kind) <br />Temporary Obstruction Fees: <br /> Dumpsters, Portable Restrooms, etc. <br /> Equipment Used for Excavation Permit <br /> <br /> <br /> <br />$100 per obstruction <br />$50 per obstruction <br /> <br />$25 per obstruction <br />No charge <br />Other ROW Management Fees and Costs: <br />Registration Fee (ROW Users & Registrants) <br />Permit Extension <br />Delay Penalty <br />Degradation Fee <br />Restoration Cost <br />Overhead Utility Line Repair <br />Street Curb Alteration <br />Temporary Access <br />Penalty for Work Done without a Permit <br />Discount For Work Done with City Project <br /> <br />$30 <br />$30 <br />10% of ROW Permit <br />Calculated at time of permit <br />Calculated at time of permit ($5,000 min.) <br />No charge <br />$50 <br />$25 per access <br />Double Fee <br />50% <br />*Additional fees may be required for legal and engineering costs incurred by the City
The URL can be used to link to this page
Your browser does not support the video tag.