Laserfiche WebLink
<br />2016 Fee Schedule Page 20 of 23 <br /> <br />VI. PUBLIC WORKS RELATED FEES <br /> <br />CALL-OUT RATE SCHEDULE (used for all hourly-based fees in this chapter) <br />Normal Business Hours for Call-out Rates 7:00 a.m. to 3:30 p.m., Monday thru Friday <br />Standard Call-out Rate: Specified time <br />conducted entirely within normal business <br />hours <br />$50 per hour specified <br />After-Hours Call-out Rate: Specified time <br />conducted outside normal business hours <br />$100 per hour specified <br />Holiday Call-out Rate: Specified time <br />conducted on holidays <br />$150 per hour specified <br />RIGHT-OF-WAY MANAGEMENT FEES (Chapter 910) <br />Excavation Permit Fees:* <br />Hole Fees: <br /> Boulevard Areas <br /> Pavement Areas <br />Underground Utility Work (requires Hole <br />Fee): <br /> OpenTrenching – Boulevard Areas <br /> Open Trenching – Pavement Areas <br />Trenchless Installation <br />Overhead Installation <br /> <br /> <br />$100 per hole excavated <br />$200 per hole excavated <br /> <br /> <br />$50 per 100 lineal feet or fraction thereof <br />$70 per 100 lineal feet or fraction thereof <br />$35 per 100 lineal feet or fraction thereof <br />$25 per 100 lineal feet or fraction thereof <br />Obstruction Permit Fees:* <br />Pavement Obstruction Fees: <br /> New Obstructions <br /> Replacing Existing Obstructions (in-kind) <br />Temporary Obstruction Fees: <br /> Dumpsters, Portable Restrooms, etc. <br /> Equipment Used for Excavation Permit <br /> <br /> <br /> <br />$100 per obstruction <br />$50 per obstruction <br /> <br />$25 per obstruction <br />No charge <br />Other ROW Management Fees and Costs: <br />Registration Fee (ROW Users & Registrants) <br />Permit Extension <br />Delay Penalty <br />Degradation Fee <br />Restoration Cost <br />Overhead Utility Line Repair <br />Street Curb Alteration <br />Temporary Access <br />Penalty for Work Done without a Permit <br />Discount For Work Done with City Project <br /> <br />$30 <br />$30 <br />10% of ROW Permit <br />Calculated at time of permit <br />Calculated at time of permit ($5,000 min.) <br />No charge <br />$50 <br />$25 per access <br />Double Fee <br />50% <br />*Additional fees may be required for legal and engineering costs incurred by the City