My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2014/09/02
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2014
>
Agenda Packets - 2014/09/02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:48 PM
Creation date
7/10/2018 1:11:43 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/2/2014
Supplemental fields
City Council Document Type
City Council Packets
Date
9/2/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2015 Fee Schedule Page 21 of 20 <br /> <br />CONSTRUCTION SITE AND LAND DISTURBANCE FEES (Ord. 804/Chapter 1303) <br />Land Disturbance Permit Fees:* <br />50 cubic yards or less <br /> <br />51 to 100 cubic yards <br /> <br />101 to 1000 cubic yards <br /> <br /> <br /> <br /> <br />1001 to 10,000 cubic yards <br /> <br /> <br /> <br /> <br />10,001 to 100,000 cubic yards <br /> <br /> <br /> <br /> <br />100,001 cubic yards or more <br /> <br />$25 <br /> <br />$50 <br /> <br />$50 base fee plus $20 for each 100 cubic <br />yards or fraction thereof <br /> <br /> <br /> <br />$250 base fee plus $25 for each 1000 cubic <br />yards or fraction thereof <br /> <br /> <br /> <br />$500 base fee plus $100 for each 10,000 <br />cubic yards or fraction thereof <br /> <br /> <br /> <br />$1,500 base fee plus $250 for each <br />100,000 cubic yards or fraction thereof. <br />*Additional fees may be required for legal and consulting engineering costs incurred by the <br />City <br />OTHER MISCELLANEOUS PUBLIC WORKS FEES (Actual time is rounded up to the nearest full hour) <br />Overweight/Oversize Permit Fee $25 per load <br />Emergency Utility Locates No charge if during business hours, <br />otherwise actual time at call-out rate <br />Call-out Charge for Contractor Negligence <br />(lack of maintenance, traffic signs, etc.) <br />Actual time at Call-out Rates <br />Water Tower Communications Fees: <br />Water Tower Access Fee No charge if during normal business hours, <br />otherwise actual time at Call-out Rate per <br />visit <br />Plan Review and Inspection Fees Actual City, legal, and consulting <br />engineering costs ($2,000 minimum) <br />
The URL can be used to link to this page
Your browser does not support the video tag.