My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/04/10
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/04/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:23 PM
Creation date
7/10/2018 1:41:52 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/10/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
4/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 07E <br />Meeting Date: April 10, 2017 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report To: Honorable Mayor and City Council <br />From: Brian Erickson, Public Works Director <br />Item Title/Subject: Resolution 8741, Accepting Bids Received by the City of Coon Rapids <br />Joint Powers Agreement for 2017 Seal Coating of Area D <br /> <br />Background: <br />The City is about to finish the process of reconstructing the twenty six (26) miles of City-owned streets <br />as part of the Streets and Utilities Improvement Program (Program). The City established a pavement <br />maintenance plan for these streets and Area D is scheduled for a bituminous seal coat in 2017. <br /> <br />Area D plus Bronson Avenue between Edgewood Drive and Raymond Avenue, and County Road H2 <br />between Program Avenue and Mounds View Boulevard will be seal coated. This area contains <br />approximately 3.0 miles of streets. Area D was reconstructed in 2011, and other than crack filling, <br />there has been no major maintenance work performed since their construction took place. To ensure <br />the longevity and performance of these roads, a bituminous seal coat is recommended. <br /> <br />Discussion: <br />The City entered into a Joint Powers Agreement (JPA) with the City of Coon Rapids on February 13, <br />2017 (Resolution 8704) to provide routine street maintenance such as traffic marking, street <br />sweeping, crack sealing, and seal coating. <br /> <br />The City of Coon Rapids prepared plans, specifications, and bid documents using the combined <br />quantities of the all the members of the JPA for the 2017 Seal Coat Project and a public bid <br />solicitation was executed to obtain pricing. The Mounds View quantity for 2017 is 60,012 square <br />yards (syd). <br /> <br />On March 17, 2017, Coon Rapids opened bids from three qualified seal coating contractors with the <br />lowest bid being submitted by Pearson Bros., Inc. of Hanover, Minnesota. The bids are as follows: <br /> <br />Rank Contractor Total Bid (Mounds View only) <br />Low Pearson Bros., Inc. $76.120.36 <br />1 Allied Blacktop Company $79,576.84 <br />2 Asphalt Surface Technologies Corp. $84,210.24 <br /> <br />The bid is a unit price bid meaning payment will be made based on measured quantities. The costs <br />provided to the JPA ($1.27/syd) are comparable to bids received in 2015 for seal coating of Areas A <br />through C ($1.26/syd). The 2017 budget includes funding of $150,000 to perform the proposed seal <br />coat work in the Street Improvement Fund (485-4470-7050). <br /> <br />As part of the JPA with Coon Rapids, Mounds View has a 30-day ‘opt-out’ period during which <br />Mounds View can completely opt out of the contract, in addition to adjusting the planned quantities. <br />Prior to the expiration of this 30-day period (April 15, 2017), Mounds View needs to provide either a <br />concurrence or an opt-out notification to Coon Rapids. Coon Rapids expects to award the contract at <br />their April 18, 2017 Council Meeting. Once the contractor begins work, Mounds View will inspect and <br />approve the work and all the invoices will come to Mounds View.
The URL can be used to link to this page
Your browser does not support the video tag.