My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/05/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/05/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:03 PM
Creation date
7/10/2018 1:50:52 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/22/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
5/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 09C <br />Meeting Date: May 22, 2017 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report To: Honorable Mayor and City Council <br />From: Brian L. Erickson, Public Works Director/City Engineer <br /> Michael L. Richie, Public Works Project Coordinator <br />Item Title/Subject: Resolution 8755, Accepting Bids and Awarding Contract for 2017 Sewer <br />Rehabilitation Project <br /> <br />Background: <br />The Engineering Division of Public Works has prepared plans and specifications (bid documents) in house <br />for use in obtaining public bids for the sanitary and storm sewer rehabilitation project. A public bid is <br />required since the estimated construction is expected to exceed $100,000. The 2017 budget includes <br />$150,000 in the sanitary sewer enterprise fund (730-4823-7050) and $25,000 in the storm sewer enterprise <br />fund (745-4415-5150) for this work. <br /> <br />Discussion: <br />Approval to solicit for public bids was received at the April 10, 2017 Council Meeting (Resolution 8740). <br />The Advertisement for Bid was published in the Sun-Focus newspaper and the online bid management <br />system Quest Construction Data Network. <br /> <br />Bids were received from five (5) qualified contractors. The following table provides the bidders names, and <br />associate bids. <br /> <br />Rank Contractor (City, State) Base Bid <br />Low Insituform Technologies USA, LLC (White Bear Lake, MN) $128,943.30 <br />2 Veit & Company, Inc. (Rogers, MN) $135,067.50 <br />3 Visu-Sewer, Inc. (Pewaukee, WI) $154,693.50 <br />4 Lametti & Sons, Inc. (Hugo, MN) $162,796.00 <br />5 Michels Corporation (Brownsville, WI) $197,148.00 <br /> <br />The low bid was submitted by Insituform Technologies USA, LLC (Insituform) of White Bear Lake, <br />Minnesota. If awarded, Insituform will begin scheduling the sewer rehabilitation work as soon as possible. <br />The contract documents require that the work be substantially complete by December 1, 2017, with final <br />completion on or before December 30, 2017. <br /> <br />Recommendation: <br />Public Works staff recommends that the City Council adopt the attached resolution approving a <br />construction contract with Insituform for the 2017 Sewer Rehabilitation Project. Staff further recommends <br />a 10% contingency of $12,900 for quantity over-runs or additional work resulting from unknown conditions <br />discovered during construction. The total budget for sewer rehabilitation is not to exceed $141,844. Any <br />additional work would require pre-approval by the Public Works Director. <br /> <br />Respectfully submitted, <br /> <br /> <br />Brian L. Erickson – Public Works Director/City Engineer
The URL can be used to link to this page
Your browser does not support the video tag.