Laserfiche WebLink
Item No: 09E <br />Meeting Date: June 12, 2017 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report To: Honorable Mayor and City Council <br />From: Brian L. Erickson, Public Works Director/City Engineer <br /> Michael L. Richie, Public Works Project Coordinator <br />Item Title/Subject: Resolution 8767, Approve Amendment to Agreement with Oertel Architects <br /> <br />Introduction: <br />The City Council is asked approve the attached resolution approving an amendment to the agreement with Oertel <br />Architects for additional design related services on the Public Works Facility (City Project No. 2017-C02). <br /> <br />Discussion: <br />Design services for the Public Works Facility were awarded to Oertel Architects on April 25, 2016 via Resolution <br />8561 in the amount of $247,860.00. Additionally, a contingency of $12,000 was included as part of Resolution <br />8561. Thus the total amount for design services under Resolution 8561 is $259,860.00. <br /> <br />Since the start of the design work there were some additional structural and mechanical engineering design <br />services required. These services included: <br />• Building layout change. As part of a discussion at a work session, the building layout was adjusted to <br />move the office area from the northeast corner to the southwest corner. This resulted in additional <br />structural design costs. <br />• Cost reductions/value engineering. In an effort to reduce the construction cost of the building a <br />maintenance bay was removed and the office area was reduced. This resulted in additional structural <br />design costs. <br />• Cold storage area adjustments. As the design developed the cold storage area was adjusted to allow for <br />the inclusion of workshop spaces and this caused a change in the HVAC and fire suppression system. <br />This resulted in additional mechanical design costs. <br /> <br />These additional services have resulted in a total additional subconsultant cost of $25,700.00. No additional <br />costs from Oertel have been incurred. In order to account for potential additional services, staff would <br />recommend a small contingency $1,300 remain available for design services. Taking all this into account ththe <br />final result is an additional cost of $16,000.00. This information summarized in the following table. <br /> <br />Work Item Original Cost Revised Cost <br />Original Design Services 247,860.00$ 247,860.00$ <br />Additional Soil Boring 1,000.00$ 1,000.00$ <br />Additional Design Services 25,700.00$ <br />TOTAL 248,860.00$ 274,560.00$ <br />Original Funding Revised Funding <br />Original Design Services 247,860.00$ 247,860.00$ <br />Contingency (5%)12,000.00$ 12,000.00$ <br />Additional Services 14,700.00$ <br />Revised Contingency 1,300.00$ <br />TOTAL 259,860.00$ 275,860.00$ <br />PW Facility Design Services Cost and Funding <br />