My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/06/26
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/06/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:39 PM
Creation date
7/10/2018 1:58:24 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/26/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
6/26/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br /> <br />2.3. The City will request the County’s concurrence to award a contract to the lowest <br />responsible bidder. <br /> <br />2.4. The City will award a contract, and pay the contractor from City funds identified for <br />the Project. <br /> <br />3. Responsibility for Construction Engineering <br /> <br />3.1. The City shall perform or contract the performance of the construction engineering <br />for all elements of the Project. <br /> <br />4. Project Costs <br /> <br />4.1. Except as provided herein, the County and City will participate in the costs of <br />construction in accordance with the Ramsey County Cost Participation Policy and <br />approved in the 2016 – 2020 Ramsey County Transportation Improvement Plan. If there is <br />a conflict between the Cost Participation Policy and this Agreement, this Agreement will <br />prevail. <br /> <br />4.2. A list of the construction pay items and percentages of City and County funding <br />responsibility as well as the total estimated City Project cost is attached as Exhibit A (Cost <br />Participation Based on Low Bid). Quantities in Exhibit A are estimates. Actual costs shall <br />be based on the contract unit prices and the quantities constructed. <br /> <br />4.3. The County will pay 50% of the cost of the sidewalk/trail located within the limits of <br />the City as shown in Exhibit B. <br /> <br />4.4. Mobilization, Field Office, Erosion Control Supervisor, and Traffic Control are <br />defined collectively as the “Prorated Items”. The City percentage of the Prorated Items is <br />calculated as follows: <br /> <br />(City Cost excluding the Prorated Items Cost) <br />City % Prorated Items = <br />(Total Project Cost excluding the Prorated Items Cost) <br /> <br />The costs in the Prorated Items calculation will be based on contract unit prices <br />and quantities at the time of contract award. No adjustments in the percentages <br />will be made if unit prices or quantities vary during construction. <br /> <br />4.5. Design Engineering Costs <br /> <br />4.6.1. The County shall pay the City a design engineering fee equal to 8% of the County’s <br />share of the project items identified in Exhibit A and those revisions requested by County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.