My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/06/26
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/06/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:39 PM
Creation date
7/10/2018 1:58:24 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/26/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
6/26/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 09C <br />Meeting Date: June 26, 2017 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report To: Honorable Mayor and City Council <br />From: Brian L. Erickson, Public Works Director/City Engineer <br />Item Title/Subject: Resolution 8779, Approving Reconstruction of County Road H <br />(County State Aid Highway 9) and County State Aid Highway 10 <br />Trail Segments 6 & 11 Cost Share Agreements with Ramsey <br />County <br /> <br />Introduction: <br />As part of their Transportation Improvement Plan, Ramsey County programmed the <br />Reconstruction of County Road H (County State Aid Highway 9) project (CR H/I-35W) for 2016. <br />This project includes two new bridges, roundabouts, a new intersection at CR H and Mounds <br />View Blvd (CSAH 10) and trail/sidewalk connections. The construction of this project is in <br />preparation for anticipated development at Rice Creek Commons in the near future. In 2016, the <br />City of Mounds View awarded County State Aid Highway 10 Trail Segments 6 & 11 (Trails) along <br />Mounds View Blvd. The two segments run from Red Oak Drive to Groveland Road on the north <br />side (Segment 6) and Woodale Drive to Edgewood Drive on the south side (Segment 11). As <br />each of these projects includes portions to be funded by both Ramsey County and the City of <br />Mounds View the attached draft agreements have been prepared to allocate these costs. <br /> <br />Discussion: <br />The CR H/I-35W cost share agreement covers three separate cost categories. They are Project <br />Cost, Design Engineering Costs and Construction Engineering and Administration Costs. The <br />Project Cost is based on costs associated with construction of sidewalk/trail, irrigation, storm <br />water ponds and project overhead items. The Design Engineering Cost is based on 8% of <br />Mounds View’s share of the ‘as bid’ cost for this project, that is, before any construction has <br />begun. The Construction Engineering and Administration Costs are based on 8% of Mounds <br />View’s share of the final contract cost, that is, after final quantities are established. It should be <br />noted that the full costs of the above items are allocated to the cities of Mounds View and Arden <br />Hills as well as Ramsey County. Based on ‘as bid’ cost of $16,722,222.22, Mounds View’s cost <br />is estimated to be $150,157.67. Ramsey County is currently reviewing cost allocations and will <br />confirm the final estimated costs prior to the Council meeting. <br /> <br />The Trail cost share agreement also covers the three categories above. In this case, the Project <br />Cost is based on the cost of the trail as allocated by Ramsey County’s cost share policy. The <br />Design Engineering and Construction Engineering and Administration Costs are calculated as <br />detailed above. Based on the ‘as bid’ cost of $564,948.28, Ramsey County’s cost is estimated to <br />be $64,728.05. At this point, the Trail project is nearly completed and thus the final costs will be <br />calculated and presented to Council in the near term. <br /> <br />Based on these two agreements the total cost to Mounds View is estimated to be $85,429.62 <br />which is Mounds View’s cost for the CR H/I-35W less Ramsey County’s cost for the Trail. The <br />funding for this is in the 2017 budget under the Street Improvement Fund (485-4470-7050) in the <br />amount of $285,000. As a result, should the estimated cost increase there is sufficient funding to <br />cover any increases. <br /> <br />The City Attorney reviewed an earlier version of this agreement that combined both of the projects,
The URL can be used to link to this page
Your browser does not support the video tag.