Laserfiche WebLink
<br />2012 Fee Schedule Page 17 of 20 <br /> <br />VI. PUBLIC WORKS RELATED FEES <br /> <br />CALL-OUT RATE SCHEDULE (used for all hourly-based fees in this chapter) <br />Normal Business Hours for Call-out Rates 7:00 a.m. to 3:00 p.m., Monday thru Friday <br />After-Hours for Call-out Rates 3:00 p.m. to 7:00 a.m., Monday thru <br />Thursday <br />Weekend and Holiday Hours for Call-outs 3:00 p.m. Friday to 7:00 a.m. Monday + <br />Holidays <br />Standard Call-out Rate: Specified time <br />conducted entirely within normal business <br />hours <br />$50 per hour specified <br />After-Hours Call-out Rate: Specified time <br />conducted entirely within or partially during <br />after-hours outside normal business hours <br />$85 $100 per hour specified <br />Weekend/Holiday Call-out Rate: <br />Specified time conducted during weekend <br />and holiday hours on holidays <br />$120 $150 per hour specified <br />RIGHT-OF-WAY MANAGEMENT FEES (Chapter 910) <br />Registration Fee (Annual) $25 $30 <br />Excavation Permit Fees:* <br />Hole Fee <br />Trench Fees (requires Hole Fee) <br /> <br />Trenchless Fees (req. Hole Fee) <br /> $125 $135 per hole excavated <br />$50 $60 per 100 lineal feet of trenching <br />beyond hole <br />$25 $30 per 100 lineal feet of utility installed <br />using trenchless methods (HDD, etc.) <br />Obstruction Permit Fees:* <br />Obstruction Base Fee <br />Lineal Obstruction Fee <br />(requires Obstruction Base Fee) <br /> <br />$50 $60 per obstruction <br />$7 $10 per 100 lineal feet obstructed (in-line <br />w/ traffic) per each week of obstruction <br />Permit Extension Fee $20 $25 <br />Delay Penalty $10 $15 per day <br />Restoration Cost Security: Determined on a <br />permit-by-permit basis by the PW Director <br />Hole Excavation (per hole) <br /> <br /> <br />Trench Excavation (per 100 feet) <br /> <br /> <br />Trenchless Excavation (per 100 feet) <br /> <br />Minimum security amounts: <br />Paved Areas: $500 <br />Turf Areas: $250 <br /> <br />Paved Areas: $2,500 <br />Turf Areas: $500 <br /> <br />Paved Areas: $500 <br />Turf Areas: $100 <br /> <br />$1,000 per hole excavated $1,000 per 100 <br />lineal feet of trenching beyond hole <br />$500 per 100 lineal feet of utility installed <br />using trenchless methods (HDD, etc.) <br />*Additional fees may be required for legal and consulting engineering costs incurred by the <br />City