Laserfiche WebLink
Fund: 700 Department: 4823 Water Infrastructure & Equipment Maintenance <br />Account Description 2008 2009 2010 2011 Description <br />3220 Natural gas 12,000 12,000 12,000 12,000 Heating fuel <br />12,000 12,000 12,000 12,000 <br />3610 Memberships 200 200 113 113 APWA - 1/4 membership <br />195 195 195 100 MN Rural Water Association (50%) <br />65 65 65 80 MN Safety Council (20%) <br />60 60 60 60 Pressurized vessel license <br />520 520 433 353 <br />3630 Training 600 600 600 - Collection operator's seminar <br />250 250 250 250 Computer training <br />200 200 200 200 Confined space safety seminar <br />120 120 120 120 Hearing test <br />50 50 50 50 License renewal <br />60 60 60 60 Maintenance Expo <br />160 160 160 800 Water operator class/exam <br />200 200 200 200 Misc. training seminars <br />400 400 400 200 MRWA workshops <br />200 200 125 150 MN Public Works Assoc workshop <br />560 560 560 560 Tuition reimbursement <br />60 60 60 60 Work zone safety seminar <br />2,860 2,860 2,785 2,650 <br />4010 Rental, equipment 2,500 2,500 2,500 3,500 Skid steer - upgrade <br />600 600 600 600 Barricades & signs <br />400 400 400 400 Tools & equipment <br />300 300 300 - Fax machine <br />3,800 3,800 3,800 4,500 <br />4800 Insurance 10,230 10,230 10,230 10,230 Share of property/liability insurance <br />10,230 10,230 10,230 10,230 <br />5130 Repairs, equipment 1,000 1,000 1,000 1,000 Chemical pump repairs <br />250 250 250 - Copier maintenance <br />350 350 350 350 Fire extinguisher recharge / repair <br />1,000 1,000 1,000 1,000 Miscellaneous repairs <br />200 200 200 - Sprinkler inspections - Well #3 (move to account 3030) <br />150 150 150 150 Radio repairs <br />2,950 2,950 2,950 2,500 <br />5140 Repairs, streets 10,000 10,000 10,000 10,000 Contractor repairs to streets after water main breaks <br />10,000 10,000 10,000 10,000 <br />5150 Repairs, utilities 800 800 800 800 RTU panel repairs <br />1,000 1,000 1,000 1,000 Electrical modifications & repairs <br />900 900 900 - Floride tanks for each well house (every 3 years) <br />- 2,500 2,500 - Leak survey (moved to account 3030) <br />2,700 5,200 5,200 1,800 <br />5155 Water service repairs 35,000 45,000 50,000 50,000 Contractor repairs to residential water services. <br />35,000 45,000 50,000 50,000 <br />5160 System maintenance 13,000 13,000 13,000 13,000 Building repairs <br />2,000 2,000 2,000 2,000 Water system maintenance & repair items <br />15,000 15,000 15,000 15,000 <br />7030 Capital, equipment 8,000 8,000 8,000 8,000 Gate valves <br />- 10,000 - - Water tower assessment <br />- - 5,000 5,000 GPS Locating Equipment (Sewer 5,000)(carryover from 2010) <br />- - 125,000 - Booster station <br />- - - 10,500 Plate compactor for backhoe <br />130,000 - - - Meters, MXUs <br />- - - - 2,000 <br />- - - 5,000 SCADA System upgrade Phase #2 well #6 <br />80,000 20,000 - - Generator (trailer mounted)(20,000 to water and 10,000 to sanitary sewer) <br />25,000 - - - Water meter reader - handheld programmer <br />218,000 38,000 138,000 28,500 <br />7050 Construction 30,000 90,000 - - Water system upgrades in conjunction with major roadway program <br />- - - 800,000 Water tower rehabilitation 2011 - $800,000 <br />- - 100,000 75,000 Well #2 motor replacement (carryover from 2010) <br />- - 22,700 22,700 Well #1,2,3 building repairs (interior and exterior repairs)(carryover from 10) <br />- - 211,000 250,000 Reservoir & booster station building and roof repairs (carryover from 2010) <br />- - - 65,000 Roof replacement wells #2, 5, & 6 <br />50,000 - 60,000 - Well pump rehabilitation project - well no. 1&2 <br />80,000 90,000 393,700 1,212,700 <br />7950 Depreciation 230,000 220,000 215,000 225,000 Estimated depreciation <br />230,000 220,000 215,000 225,000 <br />9100 Contingency 15,000 15,000 15,000 15,000 Contingency <br />15,000 15,000 15,000 15,000 <br />9900 Transfers out - - 100,000 100,000 Water system upgrades in conjunction with major roadway program <br />- - 100,000 100,000 <br />684,001 518,246 1,020,739 1,744,511 <br />93