My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/11/01
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/11/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:49 PM
Creation date
7/10/2018 4:00:40 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/1/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
11/1/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />26 <br />VI. PUBLIC WORKS RELATED FEES <br /> <br />CALL-OUT RATE SCHEDULE (used for all hourly-based fees in this chapter) <br />Normal Business Hours for Call-out Rates 7:00 a.m. to 3:00 p.m., Monday thru Friday <br />After-Hours for Call-out Rates 3:00 p.m. to 7:00 a.m., Monday thru Thursday <br />Weekend and Holiday Hours for Call-outs 3:00 p.m. Friday to 7:00 a.m. Monday + Holidays <br />Standard Call-out Rate: Specified time <br />conducted entirely within normal business <br />hours <br />$30 $50 per hour specified <br />After-Hours Call-out Rate: Specified time <br />conducted entirely within or partially during <br />after-hours <br />$60 $85 per hour specified <br />Weekend/Holiday Call-out Rate: <br />Specified time conducted during weekend <br />and holiday hours <br />$90 $120 per hour specified <br /> <br />RIGHT-OF-WAY MANAGEMENT FEES (Chapter 910) <br />Registration Fee (Annually) $25 <br />Excavation Permit Fees:* <br />Hole Fee <br />Trench Fees (requires Hole Fee) <br />Trenchless Fees (req. Hole Fee) <br /> <br /> <br />$125 per hole excavated <br />$50 per 100 lineal feet of trenching beyond hole <br />$25 per 100 lineal feet of utility installed using <br />trenchless methods (HDD, etc.) <br />Obstruction Permit Fees:* <br />Obstruction Base Fee <br />Lineal Obstruction Fee <br />(requires Obstruction Base Fee) <br /> <br />$50 per obstruction <br />$7 per 100 lineal feet obstructed (in-line w/ traffic) <br />per each week of obstruction <br />Permit Extension Fee $20 <br />Delay Penalty $10 per day <br />Restoration Cost Security: Determined on <br />a permit-by-permit basis by the PW Director <br />Hole Excavation <br />Trench Excavation <br />Trenchless Excavation <br /> <br />Minimum security amounts: <br />$1,000 per hole excavated <br />$1,000 per 100 lineal feet of trenching beyond <br />hole <br />$500 per 100 lineal feet of utility installed using <br />trenchless methods (HDD, etc.) <br />*Additional fees may be required for legal and consulting engineering costs incurred by the City
The URL can be used to link to this page
Your browser does not support the video tag.