My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/10/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/10/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:41 PM
Creation date
7/17/2018 5:46:24 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/25/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
10/25/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
34enda Seran:9. C <br />REQUEST FOR COL—TCIL CONi=- E'LkT=ON pare Yusaer. 3 216 93 <br />.2par Dare: <br />C'r A F`F� Cauarl ?ran: <br />Scemal Order of 3umness <br />?alit Hearings <br />C= 000^7CM N= NG DATE October 25, 1993 _ CaNenc agenda <br />7[ Councl Business <br />:mrn Descn.pnon: Consideration of Patching Contract Approving Pay Request of $44,137.37 to <br />Bituminous Consulting, Inc. <br />.idmsmsrra=3 3ev e-/Remmmendamon: rti <br />.4o comments a supoiemenc :his reoor. <br />Cammenm ansceee <br />3:cplanamoniSunmtarp (ectacn supplement sheets ea aeo-var/.) <br />c=V%aL <br />On August 23, 1993, Council awarded the patching contract to Bituminous Consulting, Inc. for a <br />sum of $33,547.75. Staff had mentioned that, due to the extended period of time between the <br />spring inspections (marking of the patches), and date of award, some of the areas might be <br />larger and require more material. Staff was very conservative in marking less than desirable <br />surfaces, not knowing what the bid price would be. With these two items in mind, staff <br />mentioned in a couple of issues of This Is It, that the contract would probably exceed the <br />contract amount. By having an inspector on the job, the City was able to further determine <br />whether to extend some repairs, resulting in a more effective, efficient use of funds, considering <br />that Staff would not have to repair questionable areas that could result in temporary patching <br />of <br />potholes in the early spring and permanent patches during the next summer. In two streets, <br />where major paving had occurred, there was no base material present. This was an item that <br />staff could not have foreseen, but needed to be corrected. <br />To date the City has received payment requests of approximately $50,150.00. Staff expects to <br />receive about $7,000 more in payment requests. Staff realizes that this amount greatly exceeds <br />the contract price, but wishes to stress that relatively little patching was performed in 1992 and <br />the City awarded to the low bidder. All quantities were verified and staff is very pleased with <br />the quality and professionalism in which the work was performed. <br />Council had granted the <br />Works Supervisor the <br />10% of the awarded amount. Since authority <br />e this request has been exceeded, Staff requeststhat up to <br />Council authorize the payment requests. <br />Mike Ulrich, Public Works Supervisor <br />Staff requests that Council approve the pay request of $44,137.37 to Bituminous Consulting, <br />Inc. to be funded from Account No. 100.4270-705. <br />
The URL can be used to link to this page
Your browser does not support the video tag.