My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/11/01
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/11/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:49 PM
Creation date
7/17/2018 5:53:46 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/1/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
11/1/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Uccrace --erscnal computer scfhNare S ---Co <br />(Cost :c be snare by General, Water. & Sewer Funds) <br />Cceraticns <br />Water meters $4.000 <br />Leak detector S1,500 <br />Drill press S1,1CO <br />(Cost b be share by General, Water, & Sewer Funcs) <br />Lab equipment S1,000 <br />Skid Icader update S 400 <br />(Cost to be share by General, Water, & Sewer Funds) <br />Drill rig motor S2,000 <br />Frost bucket for backhce S2,500 <br />Power converter S1,4C0 <br />Curing 1994 maintenance costs are expected to be S1,OCO more than 1993 <br />expenses. Maintenance expense may vary considerably from year to year pursuant <br />to the City's Long Term Water & Sewer Systems Maintenance and Capital <br />Improvements Plan adopted in 1963. The Plan advocates a proactive vs reactive <br />aoorcach :o system maintenance in the belief that preventive maintenance is the <br />least expensive coticn over the long term. The maintenance activity fcr 1994 is a <br />well inspection and preventive maintenance of its pumping equipment. <br />Debt Service costs of $239,873 have been budgeted for 1994 and represent annual <br />debt service on a $1.5 million bond issue for system improvements. During the Fall <br />of 1969 and early Winter of 1990, the consulting engineering firm of Short Elliott <br />Hendrickson performed a study of the City's utility system which evaluated system <br />capacity, future needs and ccrstructicniimprovement costs associated with the <br />projected needs. This Engineering Study concluded that to provide for the future <br />needs of users of the water system through the year 2CC0 the City should: 1) <br />upgrade its water treatment plants, 2) redevelop a well and install a generator at the <br />ground reservoir to provide a back-up system of filling the water tower in the event of <br />a power failure. An annual acpro criaticn for Cebt Service will be a part of Water <br />Utility Gudgets until the bonds are retired in 2013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.