My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/09/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/09/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:01 PM
Creation date
7/17/2018 6:08:55 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/13/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
9/13/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council Page Thirteen <br /> Regular Meeting September 13 , 1993 <br /> Orduno reported that the original rate structure is included in the <br /> packet as Scenario 1. The alternative rate structure is attached as <br /> Scenario 2 which would raise the yearly residential householdcost by <br /> $. 91. This rate structure would raise the yearly costs for church and <br /> school property classifications. <br /> Orduno asked Rocky Keene and Mike Ulrich, Public Works Supervisor, to <br /> do a presentation on the projects listed in the surface water utility. <br /> This will include impacts on certain areas of the City and on the City <br /> as a whole. <br /> Staff---does- not have recommendation an -th-i-s ordinance. -- The options- . <br /> would be to adopt or not adopt the ordinance. The rate structure would <br /> be formally set by resolution. The Council is at the adoption stage <br /> and it would be a roll call vote. <br /> Rocky Keene, hydrologist from SEH, the cities consulting engineers, <br /> gave a definition of the projects listed in the Local Water Management <br /> Plan. Keene reported that the Council, during the past five years, as <br /> a result of the Long Lake Road reconstruction, asked SEH to complete <br /> two studies to see what impacts certain drainage areas would have on <br /> the Long Lake Road project. One was the Ardan Avenue drainage district <br /> and the other is the Edgewood. drainage district. Mr. Keene listed <br /> those projects that were identified that would need to be constructed <br /> . in association with Long Lake Road and those that were impacted by the <br /> Long Lake Road Project. <br /> Mr. Keene stated that SEH worked. with City staff when the plan was <br /> written to determine some projects that have to be done in addition <br /> to the others throughout the City. Most of these projects are <br /> maintenance projects such as storm sewer outlets, outlet <br /> modifications, and sedimentation ponds, and controlling the City's <br /> water quality. <br /> Keene reported that the final area that was looked at in the Plan was <br /> the feasibility studies. The purpose of these studies are related to -- <br /> wetland issues. All the wetland issues have had a feasibility study <br /> connected to—them. There are other project including stzeet weeping, <br /> general maintenance of the storm sewer system and general cleaning <br /> listed in the Plan. Ditch cleaning, catch basin repair and cleaning, <br /> street sweeping is an important water quality aspect which could also <br /> be funded by the Plan. Wetlands are another important issue and, <br /> therefore,, sedimentation removal should be a part of the Plan. <br /> Mr. Keene gave a history of the City's storm sewer structure. Much of <br /> this system was built in the 1950's. A major portion of the storm <br /> sewer was constructed for sanitary sewer and not necessarily for storm <br /> water drainage. The total construction of future projects identified in <br /> the Plan will cost $1. 2 million. The only projects to take place <br /> • within the next five years are the feasibility studies. <br /> -II'' <br />
The URL can be used to link to this page
Your browser does not support the video tag.