Laserfiche WebLink
3/92 <br />SUBWATERSHED <br />DESIGNATION <br />GF-o <br />35W-3 <br />EW-1 <br />EW-7 <br />EW-8 <br />EW-8 <br />EW-10 <br />Table 3.5 (Cont.) <br />PRIORITY CORRECTIVE ACTION <br />Future Ditch improvement on <br />reach draining into <br />Judicial Ditch No. 1 <br />between Lois Drive and <br />Hillview Road. <br />Future Sediment Removal <br />High Feasibility study on <br />optimal wetland manage- <br />ment and function of the <br />wetland located between <br />Old Highway 10 and Silver <br />Lake Road north of County <br />Road I. Cost of con- <br />struction can be born by <br />the developer of the site. <br />High New outlet pipe from <br />wetland to Long Lake <br />Road storm sewer system. <br />High Construction of a <br />water quality improve- <br />ment wetland at Long Lake <br />Road and Ridge Lane. <br />The basin was initially <br />proposed in SEH report <br />"Edgewood District <br />Drainage Plan" (1988). <br />Feasibility and Construction <br />Plans and Specifications <br />under SEH Job r89271. <br />High Trunk storm sewer from <br />Silverview Pond to Long <br />Lake Road and County <br />Road H2 (part of Long <br />Lake Road storm sewer). <br />High Trunk storm sewer from <br />Long Lake Road and <br />Ridge Lane to Woodcrest <br />Drive and Irondale Road <br />(part of Long Lake Road <br />storm sewer). <br />3.2 - 5 <br />