Laserfiche WebLink
17. Plumbing Work (plus surcharge) <br />A. plumbing fixture, devices, connections - $15.00 plus <br />$7.00 per fixture, device and connection <br />18. Refrigeration Work (plus surcharge) <br />A. equipment under 100,000 BTU per hour capacity <br />(12,000 BTU per ton) - $15.00 plus $2.00 per 10,000 <br />BTU per hour or fraction thereof over 10,000 BTU per <br />hour capacity <br />B. equipment over 100,000 BTU per hour capacity (12,000 <br />per ton) - $35.00 plus $2.00 per 100,000 BTU per hour <br />or fraction thereof over 100,000 BTU per hour capacity <br />19. Signs, Billboards (no surcharge) <br />A. signs up to 100 square feet 50.00 $35.00 for the first <br />24 square feet plus $5.00 for each additional 25 square <br />feet or fraction thereof of to 100 square feet <br />B. signs 100 square feet and over 75.00 $66.00 for the <br />first 100 square feet plus $10.00 for each additional 100 <br />square feet or fraction thereof <br />C. signs: refacing or altering - $20.00 per installation <br />20. Heating and Ventilation Work (plus surcharge) <br />A. gas, oil burner equipment - $25.00 plus $5.00 per <br />100,000 BTU per hour or fraction thereof over 100,000 <br />BTU per hour input (commercial, rooftop units) <br />B. gravity warm air heating - $35.00 per installation repair, <br />alteration or extension <br />C. mechanical warm air heating - $25.00 plus $5.00 per <br />100,000 BTU per hour or fraction thereof over 200,000 <br />BTU per hour input capacity <br />D. duct or tin work - Use Valuation Table <br />