My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/12/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/12/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:31 PM
Creation date
7/17/2018 6:14:08 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/6/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
12/6/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
suspi;N.5_LQJi U QPERATIAS <br />operations shall continue until all roads are passable. Widening <br />and clean up operations may continue immediately or the following <br />working clay dependent on conditions. operations may also he <br />suspended during periods of limited or zero visibility. Any <br />decision to suspend operations shall be made by the supervisor on <br />duty and shall be based on conditions of the storm. <br />pLW goU,EES A 1p SFOUENCING <br />There are city streets, public sidewalks, public parking lots, <br />and ice rinks under the City's jurisdiction which are affected by <br />this policy. All City streets will be assigned to a route. <br />sidewalks along collector streets, and sidewalks serving public <br />facilities shall be cleared by City forces after street routes <br />are completed. City parking lots and ice rinks shall also be <br />cleared after street routes have been completed. The attached map <br />shall indicate plow routes and sidewalks, parking lots and ice <br />rinks designated to he cleared. <br />Phe pul)lic: Works Foreman has the responsibility of determining <br />plow routes and sequencing of operations. The routes and <br />sequencing shall be indicated on the route map. This map shall he <br />adopted by the City Council and shall not be altered without <br />consultation and approval of Council. The Foreman shall retain <br />latitude to adjust sequencing or route assignments based on storm <br />conditions, equipment availability, and/or other conditions <br />warranting changes. <br />Priority locations are indicated on the route map. These <br />locations are of public interest and may be given higher priority <br />for response dependent on the time of day or other circumstance. <br />These areas include the City Nall complex, schools, and <br />locations of public interest. <br />EEVEI, OF SEINUCE <br />The intention of this policy is to provide safe winter driving <br />conditions appropriate for the type of travel necessary on the <br />city's streets. The level of service described herein shall be <br />considered a guideline with the understanding that during and <br />immediately after a storm the level of service provided may be <br />less than described herein and may vary across the City dependent <br />on storm conditions. Streets shall be plowed and/or sanded to <br />provide intermittent bare pavement and sanded intersection <br />approaches and curves. cul-de-sacs and dead end streets may have <br />few if any bare pavement spots. Gravel and dirt road surfaces <br />shall be plowed to provide a hard pack surface with sand and/or <br />abrasives spread as necessary for traction. A minimum of <br />chemicals will be used to achieve the conditions stated and to <br />provide workable stock piles of sand and/or abrasives. <br />OA <br />
The URL can be used to link to this page
Your browser does not support the video tag.