Laserfiche WebLink
E. ventilation systems <br /> (1) using fans less than 100 CFM - $5.00 plus <br /> $2.00 for each fan <br /> (2) using fans more than 100 CFM - $25.00 plus $2.00 <br /> per 1 ,000 CFM or fraction thereof over 3,000 CFM <br /> plus $5.00 for each fan <br /> 21 . General Sheet Metal Work - Use Valuation Table (plus <br /> surcharge) <br /> 22. Incinerators (plus surcharge) <br /> A. domestic portable incinerator - $25.00 per unit <br /> B. commercial, industrial incinerator - $60.00 per unit <br /> 23. Elevators, etc. - Use Valuation Table (see surcharge and plan <br /> check fee for additional charges) <br /> 24. Installation of Mobile Homes - $35.00 per Installation (plus <br /> $.50 surcharge) <br /> 25. Satellite Dishes - $20.00 per Installation (plus $.50 surcharge) <br /> 26. Swimming Pools <br /> Filling - $25.00 plus $1 .0 15 per 1 ,000 gallons of water used <br /> Bldg. Permit _ Valuation_Per_Square_-Foot _- _ _ _ - <br /> Above Ground $6.00 <br /> Below Ground $20.00 <br /> With Decking/Fencing Add: $2.00 <br /> See Valuation Table when value has been determined. Also <br /> see surcharge and plan check fee for additional charges. <br /> 27. Temporary Signs - $15/21 day period <br /> 28. Contractor Licenses (Chapter 60) (see Building Dept. <br /> Procedures Manual for specific license type) - $40/Year <br /> State License Verification Fee - $5.00 per permit <br />