Laserfiche WebLink
PLOW ROUTES AND SEOUENCING <br />There are City, streets, public sidewalks, public parking lots, and ice rinks under the City's <br />jurisdiction which are affected by this policy. All City streets will be assigned to a route. <br />Sidewalks along the collector streets and sidewalks, serving public facilities, shall be cleared <br />by City forces after street routes are completed. City parking lots and ice rinks shall also be <br />cleared after street routes have been completed. <br />The Public Works Supervisor has the responsibility of determining plow routes and sequencing <br />of operations. The Supervisor shall retain latitude to adjust sequencing or route assignments <br />based on storm conditions. equipment availability and/or other conditions warranting changes. <br />Priority locations include, but not limited to. City Hall complex. schools and locations of public <br />interest. <br />LEVEL OF SERVICE <br />The intention of this policy is to provide safe winter driving conditions appropriate for the type <br />of travel necessary on the City's streets. The level of service described herein shall be <br />considered a guideline with the understanding that during and immediately after a storm, the <br />level of service provided may be less than described herein and may vary across the City <br />dependent on storm conditions. Streets shall be plowed and/or sanded to provide intermittent <br />bare pavement and sanded intersection approaches and curves. Cul-de-sacs and dead end <br />streets may have few, if any. bare pavement spots. Gravel and dirt road surfaces shall be <br />plowed to provide a hard pack surface with sand and/or abrasive spread as necessary for <br />traction. <br />During light to normal snowfalls, streets will be plowed full width on the initial pass. During <br />heavier snowfalls, streets shall be plowed as wide as possible initially and widened as the storm <br />intensity lessens. After the storm passes, clean up operations shall begin to clear intersections <br />and snow storage areas along corners and boulevards. It is the City's intent to complete initial <br />plowing and widening operations within 12 hours of the cessation of the storm. Clean up <br />operations should be complete within 24 hours for light snowl'alls, and within 48 hours for <br />heavy snowfalls. Major blizzards may require additional time. <br />PARKING RESTRICTIONS <br />Snow plowing and ice control operations can cause property damage even under the best of <br />circumstance and carefulness on the part of the operators. The major types of damage are to <br />improvements in the Right -of -Way and landscape damage. It is appropriate to specify when <br />this damage shall be the responsibility of the City and when it shall he the responsibility of the <br />resident. <br />