My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1992/10/05
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1992
>
Agenda Packets - 1992/10/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:22 PM
Creation date
7/17/2018 8:33:02 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/5/1992
Supplemental fields
City Council Document Type
City Council Packets
Date
10/5/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Operations consists of administration, utility billing and collections, collection of <br /> sewage and its transfer from City sewer mains to the interceptor mains of the <br /> MWCC, and the payment of sewage treatment costs to the MWCC. <br /> Personnel costs represent 21.57% of the operating costs of the Sewer Utility. As <br /> indicated in the chart below, 4.41 full time equivalent positions are budgeted for <br /> 1993. This is an increase of 0.12 full time equivalent positions from 1992. <br /> Budgeting the Division Secretary at 40 hours per week (split with the Water Utility) <br /> for 1993 compared to 30 hours per week in 1992 accounts for the increase. Staff <br /> proposes this to further remove clerical duties from the maintenance workers and to <br /> allow them to concentrate their efforts on maintenance activities. <br /> SCHEDULE OF FULL & PART-TIME EMPLOYEES <br /> 1992 1993 <br /> Director of Public Works/City Engineer 0.33 0.33 <br /> Public Works Foreman 0.33 0.33 <br /> Engineering Aide 0.50 0.50 <br /> Division Secretary 0.38 0.50 <br /> Utility Accountant 0.50 0.50 <br /> Accounting Clerk 0.25 0.25 <br /> Maintenance Workers 2.00 2.00 <br /> Total 4.29 4.41 <br /> Materials and supplies are 1.99% of the operating costs of the Sewer Utility. The <br /> materials and supplies budget for 1993 is 19.92% less than that of 1992. The <br /> decrease is primarily due to a decrease in equipment supplies as a result of the <br /> remodeling of the Bronson Drive lift station and updates at the Groveland Road lift <br /> station. In addition fewer repair parts have been budgeted for the sewer jet rodder <br /> as the purchase of a new unit has been proposed for 1993. <br /> Contractual Services are 67.60% of the operating costs of the Sewer Utility. <br /> Budgeted contractual services for 1993 are 2.24% less than the amount budgeted for <br /> 1992. Sewage disposal costs paid to the MWCC are scheduled to decrease by 2.73% <br /> in 1993. The cost of sewage treatment is expected to increase by 3.85% in 1993. The <br /> decrease in the overall bill is a result of a decrease in the estimated amount of <br /> sewage to be treated during 1993 and a credit for an overbilling in 1991. The <br /> MWCC estimated the City's 1991 sewage treatment costs on the basis of 505 million <br /> gallons whereas actual was 494 million gallons. The resultant credit of $35,018 from <br /> this overbilling is reflected on the 1993 estimated-billing. In addition,, less electrical- <br /> usage has been budgeted as a consequence of the remodeling of the Bronson Drive <br /> lift station and the update of the Groveland Road lift station. <br />
The URL can be used to link to this page
Your browser does not support the video tag.