Laserfiche WebLink
MVFPZ.ORD 318/92 <br /> Subdivision 2 . Use Permit. <br /> (a) Use Permit Required. A use permit issued by the Zoning <br /> Administrator is conformity with the provisions of this <br /> Chapter shall be secured prior to the erection, addition, <br /> or alteration of any building, structure, or portion <br /> thereof; prior to the use or change of use of building, <br /> structure, or land; prior to the change or extension of <br /> a nonconforming use; and prior to the placement of fill <br /> or excavation of materials within the F. Z.D. <br /> (b) Application for Use Permit. Application for a use permit <br /> shall be made in duplicate to the Zoning Administrator on <br /> forms furnished by him/her and shall include the <br /> following where applicable: plans in duplicate drawn to <br /> scale, Ghowing the nature, location, dimensions, and <br /> elevations of the lot; existing or proposed structures, <br /> fill, or storage of materials; and the location of the <br /> foregoing in relation to the stream channel or water <br /> body. <br /> (c) State and Federal Permits. Prior to granting a use <br /> permit or variance, or processing an application for the <br /> conditional use permit, the Zoning Administrator shall <br /> determine that the applicant has obtained all necessary <br /> State and Federal permits. <br /> (d) Certificate of Zoning Compliance for a New, Altered, or <br /> Nonconforming use. It shall be unlawful to use, occupy <br /> premises or part thereof hereafter created, erected, <br /> changed, converted, altered, or enlarged in its use or <br /> structure until a Certificate of Zoning Compliance shall <br /> have been issued by the Zoning Administrator stating that <br /> the use of the building or land conforms to the <br /> requirements of this Chapter. Where a nonconforming use <br /> or structure is extended or substantially altered, the <br /> Certificate of Zoning Compliance shall specifically state <br /> the manner in which the nonconforming structure or use <br /> differs from the provisions of this ordinance. <br /> (-e-) Construction-end Usa to-be-as-Provided in-Applications, <br /> Plans, Permits, and Certificate of Zoning Compliance. <br /> Use permits, conditional use permits, or Certificates of <br /> Zoning Compliance issued on the basis of approved plans <br /> and applications authorize only the use, arrangement, and <br /> construction set forth in such approved plans and <br /> applications, and no other use, arrangement, or <br /> construction. Any use, arrangement, or construction at <br /> variance with that authorized shall be deemed a violation <br /> of this Chapter. The applicant shall be required to <br /> submit certification by a registered professional <br /> engineer, registered architect, or registered land <br /> surveyor that the finished fill and building elevations <br /> were accomplished in compliance with the provisions of <br /> this Chapter. Flood-proofing measures shall be certified <br /> by a registered professional engineer or registered <br /> architect. <br /> 49 - 7 <br />