My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1992/05/26
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1992
>
Agenda Packets - 1992/05/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:07 PM
Creation date
7/17/2018 3:13:50 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/26/1992
Supplemental fields
City Council Document Type
City Council Packets
Date
5/26/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 4235 <br /> PAGE FOUR <br /> (13) moving buildings $30.00 per building <br /> over private land <br /> Subdivision 3. Electrical Work: <br /> Same as established in the MN State Board of <br /> Electricians March 1, 1972, Edition of Laws and <br /> Regulations Licensing Electricians and Inspections of <br /> Electrical Installations or as amended <br /> (E) Additional Permits Required. <br /> 1. Pipe Fitting. (plus State surcharge) <br /> (a) gas, oil piping Use Valuation Table <br /> (b) steam, hot water heating $25.00 plus $5.00 <br /> systems per 100, 000 per <br /> hour or fraction <br /> thereof over 200, 000 <br /> BTU per hour <br /> (c) fire extinguishing equipment <br /> (1) standpipes $20. 00 per standpipe <br /> (2) sprinkler equipment $30. 00 ($20. 00) plus <br /> $4.00 for each ten <br /> sprinkler heads or <br /> fraction thereof <br /> over ten heads <br /> 2 . Plumbing Work. (plus State surcharge) <br /> (a) plumbing fixture, devices, $15.00 plus $7. 00 <br /> connections ($3 . 00) per fixture, <br /> device and <br /> connections plus <br /> $.50 surcharge <br /> (b) garbage grinder or $5. 00 per unit <br /> dishwasher <br /> 3 . Refrigeration Work. (plus State surcharge) <br /> (a) equipment under 100, 000 $15.00 plus $2. 00 <br /> BTU per hour capacity $2.00 per 10,GOfl <br /> (12, 000 BTU per ton) 10, 000 BTU per <br /> hour or fraction <br /> thereof over <br /> 10, 000 BTU <br /> per hour capacity <br />
The URL can be used to link to this page
Your browser does not support the video tag.