Laserfiche WebLink
<br /> <br /> <br />29 <br />I-1 Industrial $49.72 per quarter/acre <br />PUD Planned Unit Development $56.39per quarter/acre <br />CRP Conservancy, Recreation and <br />Presentation <br />$6.94 per quarter <br />School/Church, Public, Private $22.89 per quarter <br /> <br />Water Availability Charge (WAC) <br />Residential $400/unit <br />Commercial/Industrial $1,000/acre of developable area (minimum <br />$1,000) <br />Water Charge $1.50 per 1,000 gallons <br />Tapping (water or sewer) City does not perform this service <br />Water Connection/Repair Permit <br />Inspection An after hours inspection of a water and/or <br />sewer connection or repair will be charged as <br />a callout. A callout is defined as a minimum <br />of two hours pay at one and one-half (1 ½) <br />times the employee’s base pay rate. <br />Service less than 4 inches $30 (no surcharge) <br />Service 4 inches or greater $50 (no surcharge) <br />Water Disconnect or Reconnect $25 <br />Water Hydrant Fees <br />Deposit $1,000 <br />Water used from hydrant: $1.50 Current Rate per 1,000 gallons <br />Meter Deposit, 2- 3": $500 <br />5/8" Meter Deposit: $100 <br />Wrench Deposit: $100 <br />Hose Deposit: $100 per hose <br />Adapters: $100 deposit <br />Water Meter $90 Cost plus sales tax <br />Meter Testing (Chapter 906) $50 (Free if meter is faulty)