Laserfiche WebLink
Item No: 07A <br />Meeting Date: January 9, 2006 <br />Type of Business: CB <br />City Administrator Review: _____ <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br /> <br />From: Fire Chief Zikmund <br /> Deputy Fire Chief Krueger <br /> <br />Item Title/Subject: Resolution 6706 Accept Bid for Remaining Contracts <br />Comprising of Bid Package #2 for the New SBM Fire <br />Station #3 <br /> <br /> <br />Background: <br />As a component of the Fire Department Capital Improvement Plan funded by the sale of <br />Capital Improvement Bonds sold on November 17th, 2005, a new fire station located at <br />11920 Ulysses Street was approved. The new station will consolidate/replace existing <br />stations three and five. A budget of $7,082,621 has been established for this portion of <br />the CIP plan. <br /> <br />The Blaine Council approved the letting of bids for the 2nd Bid Package at their October <br />20th , 2005 meeting. Advertisements were placed in the official Blaine newspaper, “The <br />Blaine Life,” in the Construction Bulletin and the Builders Exchange. The 2nd Bid <br />Package consisted of the following contracts: <br /> <br />#3.35 Cast in place concrete <br /> #4.20 Masonry <br /> #5.10 Steel Erection <br /> #5.12 Steel Supply <br /> #6.10 Rough/Finish Carpentry <br /> #7.50 Roofing/Sheet Metal <br /> #7.90 Caulking <br />#8.10 Metal Doors/Wood Doors/Frames <br />#8.33 Overhead Doors <br />#8.40 Aluminum Entrance Doors/Windows <br />#9.25 Steel Stud/Drywall <br />#9.30 Tile/Terrazzo <br />#9.50 Acoustical Ceiling <br />#9.65 Resilent Flooring/Carpet <br />#9.90 Painting <br />#11.60 Stainless Steel/Appliances <br />#15.00 Mechanical <br />#15.30 Fire Protection <br />#16.00 Electrical <br /> <br />Specifications were made available on October 30, 2005, and one addendum was <br />issued on November 18, 2005. The specifications and addendum were sent to the Fire <br />Department, all three cites, and the Builders Exchange.