Laserfiche WebLink
Mounds View City Council January 23, 2006 <br />Regular Meeting Page 31 <br /> <br />Public Works Director Lee added there would be an impact to the flood plain on the south end of 1 <br />the property. He explained that for any areas filled, the City will have to replace at a one to one 2 <br />ratio and grade down the park in the upper area next to the playground. Public Works Director 3 <br />Lee pointed out that the new proposal would require less storm sewer and result in cost savings 4 <br />from the storm sewer standpoint. He explained under the old proposal, a large area would need 5 <br />to be disturbed for flood plain mitigation. 6 <br /> 7 <br />Public Works Director Lee reported the overall cost for the two scenarios is about the same, as 8 <br />the additional cost for adding four parking stalls under the new proposal is the same as the cost 9 <br />for adding an additional storm sewer on the original plan. He reported that the City will get bids 10 <br />on February 2, 2006, and if the Council is interested, the City could get bid alternatives or add 11 <br />this as a change order at a later date. He stated there are some issues with doing it both ways and 12 <br />it should be looked at as an option to consider when the contract is awarded on February 13, 13 <br />2006. 14 <br /> 15 <br />Councilmember Thomas stated the major issue is the change in the access from Long Lake Road 16 <br />to Ridge Lane, as far as what benefits that could bring the City. 17 <br /> 18 <br />Public Works Director Lee stated from a traffic pattern standpoint, it is better to access from 19 <br />Ridge Lane. He noted from the County standpoint, they would appreciate eliminating access off 20 <br />Long Lake Road. He stated the impact to the adjacent property also needs to be reviewed. 21 <br /> 22 <br />Councilmember Gunn stated there is a major issue in safety coming off Ridge Lane. She stated 23 <br />that when one comes off Long Lake Road, it is always iced over and is difficult to get out, 24 <br />especially for parents with young kids getting of school. She stated it is nearly impossible to get 25 <br />out on Long Lake Road, and it is the same in late afternoon when residents are coming back from 26 <br />work. She stated that this is a much safer idea. 27 <br /> 28 <br />Public Works Director Lee commented that the building was orientated to the south parking lot. 29 <br /> 30 <br />Mayor Marty commented that it does look like it works better, but he would like the residents 31 <br />who live in the area to have input. He stated that while he does not see it being a problem, the 32 <br />residents are the ones who live there and deal with it more on a daily basis. 33 <br /> 34 <br />Mayor Marty stated he had discussions with Director Ericson, Public Works Director Lee and 35 <br />City Administrator Ulrich regarding the wetland credits for Woodcrest Park to see if they could 36 <br />be used for the Sysco property. Mayor Marty stated that it does not sound like it is feasible 37 <br />because the City is using some of the credits for the new trailway. 38 <br /> 39 <br /> 5. Silver Lake Road 40 <br /> 41 <br />Mayor Marty pointed out that he received a resident concern regarding what side of Silver Lake 42 <br />Road to put the trail on. He stated that the issue was safety and explained that once the stop light 43 <br />is put in on County Road H and Silver Lake Road, traffic could be moving faster coming up 44 <br />Silver Lake Road. Mayor Marty stated that if one is coming up Silver Lake Road and has a green 45