My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-1991 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1991
>
07-08-1991 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:51 PM
Creation date
7/18/2018 7:04:24 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/8/1991
Supplemental fields
City Council Document Type
City Council Packets
Date
7/8/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUTNAM 7441 Jolly Lane <br /> Brooklyn Park, MN 55428 <br /> CONSULTANTS Phone (612) 425-1233 <br /> P.A. FAX (612) 425-2033 <br /> July 2 , 1991 <br /> Mr . Rick Baker <br /> Everest Development , Ltd . <br /> 2685 Long Lake Road <br /> Roseville , Minnesota 55113 <br /> Re : Mounds View Business Park South <br /> Mounds View, Minnesota <br /> (90-018) <br /> Dear Mr . Baker : <br /> I have reviewed a copy of the site plan prepared by Dovolis , <br /> Johnson , and Ruggieri , Inc . , and find that the plan closely <br /> conforms with the initial overall plan developed in 1989 . It <br /> appears that the buildings , parking areas , driveways , and <br /> ponding area are only slightly different . <br /> The sanitary sewer and watermain systems designed and <br /> constructed with the initial phase of the development will <br /> adequately service the development proposed in this revised <br /> plan . As you may recall , the storm sewer system was designed <br /> and constructed to provide for the full site development <br /> and will require modification only in that the existing <br /> temporary ponding areas will be eliminated , the permanent <br /> pond will be required, and the piping systems extended to <br /> this new ponding area . <br /> Subsequent to the 1989 plan , the Rice Creek Watershed <br /> District adopted requirements for detention areas to be <br /> designed with some retention (ponding below the outlet) for <br /> sedimentation and treatments u.rp-o-s-es - The propose p nd_y ng <br /> area will have to be designed with these new watershed <br /> requirements, however, the impact may be inconsequential in <br /> that we have always proposed that the permanent pond would <br /> be an aesthetic pond with standing water below the outlet . <br /> In summary, I find that the current site plan is <br /> substantially the same as that proposed in 1989 . <br /> Sinc ely, <br /> / //�� <br /> a id . Putnam, P. ' <br /> President <br />
The URL can be used to link to this page
Your browser does not support the video tag.