Laserfiche WebLink
REQUEST FOR COUNCIL CONSIDERATION Agenda Section: 7 <br /> 1111176 <br /> STAFF REPORT Report Number: <br /> AGENDA SESSION DATE July 1, 1991 Report Date: 6-2 7-91 <br /> DISPOSITION <br /> City Hall Remodeling <br /> Item Description: <br /> Administrator's Review/Recommendation: <br /> - No comments to supplement this report )3 V - <br /> - Comments attached. <br /> Explanation/Summary (attach supplement sheets as necessary.) <br /> SUMMARY: <br /> Staff has reviewed the City Hall Expansion plans submitted by The <br /> Architectural Alliance and prepared scaled down remodeling <br /> options. The attached floor plans indicate 2 possible schemes for <br /> remodeling. These would not supplant the future expansions, but <br /> may be able to provide an improved work environment for 5 to 10 <br /> years. <br /> The options staff developed utilize the existing treatment plant <br /> area ,for a community room and Parks and Recreation office space. <br /> Both options share the concept of moving Public Works to the <br /> basement and terracing to provide windows along the west and <br /> south walls. Option 1 would provide a new police garage and <br /> remodel the existing garage for office space. Option 2 would <br /> provide less space, but does not require any increase in building <br /> foot-print. <br /> These options are conceptual, we do not have either the time or <br /> expertise to do a detailed study. We have developed very rough <br /> cost estimates. Option 1 is estimated to cost between $250,000 <br /> and $300,000: Option 2 is estimated to be between $200,000 and <br /> $250,000. <br /> If the Council feels it is appropriate to pursue these options, I <br /> would recommend that an architectural firm be retained to refine <br /> the options and provide detailed estimates. <br /> Ric Min-tor <br /> City Engineer/Director of Public Works <br /> RECOMMENDATION; <br />