My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1991/05/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1991
>
Agenda Packets - 1991/05/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:48 PM
Creation date
7/18/2018 7:34:42 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/6/1991
Supplemental fields
City Council Document Type
City Council Packets
Date
5/6/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 9 a gh <br /> Project There are two projects that will affect this area. <br /> Description The first project is the Anoka/Champlin bridge which is divided <br /> into two stages. This bridge is on the National Register of Historic <br /> Structures and Mn/DOT is required to do only rehabilitation work to the <br /> existing bridge. Stage 1 consists of building a temporary bridge to carry <br /> traffic during reconstruction of the existing bridge. Stage 2 consists of <br /> removing the existing bridge down to its arches.. The deck will then be <br /> widened and replaced. <br /> The second project includes construction of two additional lanes <br /> from 93rd. Ave. to approximately 117th Ave. and a 4 lane divided <br /> highway north of Hayden Lake Road. <br /> Construction Anoka/Champlin Bridge <br /> Year Stage 1 1991 <br /> Stage 2 1993 <br /> Roadway widening 1993 <br /> Cost Anoka/Champlin Bridge <br /> Stage 1 $3.0 Million <br /> Stage 2 $3.7 Million <br /> Roadway Widening $4.8 Million <br /> Project Anoka/Champlin Bridge <br /> Status Stage 1 Under construction <br /> Stage 2 This_project is currently being designed by a <br /> consultant engineering firm. <br /> Roadway Widening This project is now in the final design stage. <br /> Traffic Anoka/Champlin Bridge <br /> Forecast Current ADT 38,000 <br /> Year 2010 ADT 53,000 <br /> Roadway Widening <br /> Current ADT 21,700 - 22,500 <br /> Year 2010 ADT 35,000 - 50,000 <br /> Contact Anoka/Champlin Bridge Scott McBride 593-8532 <br /> Person Roadway Widening Evan Green 593-8537 <br />
The URL can be used to link to this page
Your browser does not support the video tag.