Laserfiche WebLink
111 0igh <br /> Project The CSAH 81 and 36th Ave. interchange projects are part of a <br /> Description larger reconstruction project to upgrade TH 100 to freeway standards <br /> from Glenwood Ave. to 50th Ave. North. <br /> Construction 1994 36th Ave. N. interchange <br /> Year 1995 CSAH 81 interchange <br /> Cost 36th Ave. N. Interchange $7,000,000 <br /> CSAH 81 Interchange $6,000,000 <br /> Project An Environmental Impact Statement is being prepared by the <br /> Status consulting firm of Barton Aschman and Assoc. Alternative geometric <br /> layouts are also being developed by Mn/DOT. <br /> Traffic Current ADT 42,000 - 72,500 <br /> Forecast Year 2010 ADT 71,942 - 106,848 <br /> Accident Accident rate studies done by Golden Valley Planning office <br /> Rate established that existing TH 100 is twice as dangerous as a four or six <br /> lane suburban freeway. Upgrading existing TH 100 to a controlled <br /> access freeway with grade separated interchanges will dramatically <br /> increase the safety of the corridor. <br /> Contact Steve Hay 593 - 8535 <br /> Person <br />