Laserfiche WebLink
Aew If]d Tath <br /> Project New TH 10 is being designed as a 4 lane freeway to connect <br /> Description I-35W with the TH 610 river crossing. Its purpose is primarily to relieve <br /> the traffic congestion that currently exists on inplace TH 10. <br /> Construction The project is divided into 4 construction stages. <br /> Year 1992 Stage 1 upgrades the inplace roadway to a freeway design from TH <br /> 65 to Co Rd J including new interchanges. <br /> 1993 Stage 2 completes the roadway from Egret Blvd. to Foley.Blvd. <br /> This will also include a new Foley Blvd. interchange. <br /> 1994 Stage 3 completes a section from TH 47 to University Ave. <br /> which includes a new University Ave. interchange. <br /> 1995 Stage 4 completes the last section of roadway from University Ave. <br /> to TH 65. <br /> Cost Stage 1 $17,500,000 <br /> Stage 2 $15,200,000 <br /> Stage 3 $17,000,000 <br /> Stage 4 $17,000,000 <br /> Project The fmal design of Stage 1 is now being completed and right of way is <br /> Status being acquired. Stages 2 and 3 are in final design and Stage 4 is hi <br /> predesign. <br /> Traffic ADT 1989 35,800 - 38,700 (Taken from Old TH 10) <br /> Forecast ADT Year 2010 67,000 - 76,600 <br /> Contact Stages 1 - 3 Keith Shannon 593-8501 <br /> Person Stage 4 Mark Benson 593-8530 <br />