Laserfiche WebLink
The painting or demolition of tower #2 is a complex issue. As we <br /> have previously discussed; due to the lead based primer, painting <br /> of this tower may be very expensive. The tower would likely need411 <br /> to be shrouded to contain the removed paint and cleanup on the <br /> ground could also be expensive. The alternative is to either <br /> remove this tower or to remove the existing tower and put up a <br /> smaller tower. We are preparing computer simulation models of the <br /> water system to determine if a tower is trult needed and if so <br /> what size. The estimated $345 , 000 would cover the cost .of <br /> removing this tower and installing a new smaller tower. The <br /> Council will need to determine if this project should be included <br /> in the bond issue also. <br />