Laserfiche WebLink
MMIL <br /> • <br /> • <br /> . ' C r <br /> "Individual Sewage <br /> Treatment System <br /> Standard. " <br /> 410. Organic wWaste which <br /> would normally be <br /> disposed of at a <br /> solid or hazardous <br /> waste disposal site <br /> or which would <br /> normally be <br /> discharged into a <br /> sewage disposal <br /> system or sewer <br /> shall not be <br /> directly or <br /> indirectly <br /> discharged to a <br /> wetland. <br /> all. Construction <br /> erosion control <br /> measures and <br /> retention facilities <br /> 1111 shall be put in "Subdivision 3A11" <br /> place prior to <br /> commencement of each Intent: Clarification of original <br /> development language. <br /> eens-true-tion site so <br /> ea designed to limit Justification: We believe that the <br /> soil loss from the intent of this provision was to <br /> development site to provide for the review of plans and <br /> not more than five specifications of erosion control <br /> (5) tons per acre measures, and to require that the <br /> per year. Plans and erosion control measures to be in <br /> supporting place prior to construction. This <br /> documentation fur- language clearly states these <br /> such measures and requirements. <br /> facilities shall be <br /> developed and <br /> approved by the City <br /> prior to <br /> commencement of <br /> construction. <br /> A . Sediment yield from <br /> construction sites "4. Sediment yield from. . ." <br /> iadjacent or <br /> 2362161/WZO.WP/PLS 22 <br />