Laserfiche WebLink
Ni-g44/L./ <br /> • MEMO TO: MAYOR AND COUNCILMEMBERS <br /> FROM: JERRY SKELLY, JR. <br /> CABLE TECHNICIAN <br /> DATE: SEPTEMBER 25, 1990 <br /> SUBJECT: CONSIDERATION OF BIDS FOR THE CONSTRUCTION <br /> OF A CABLE TV CONTROL ROOM <br /> Three bids have been received for construction of a cable TV control room to be <br /> located In City Hall lower level. The three bids are: <br /> New View Construction, Inc. $3,470.00 <br /> Brunn Construction Co., Inc. $3,660.00 <br /> Brama Construction $3,950.00 <br /> Electrical costs were excluded from the bids because staff is unsure of cable hook-up <br /> . needs of new equipment. Once the control room is constructed and equipment is <br /> moved in, electrical needs can be determined. <br /> The bids include studding the room, installing 5/8 inch sheetrock on both sides with <br /> wood paneling/plywood on both sides, installation of door, relocation of thermostat <br /> and additional sprinkling system needs. <br /> Staff is requesting this work to be funded using Cable TV fund balance which <br /> currently is $17,000.00. <br /> RECOMMENDATION: To approve the bid from New View Construction, Inc. for a <br /> sum of $3,470.00 plus 10 percent ($347.00) contingency for a total of $3,817.00 for <br /> construction of a Cable TV control room in lower level City Hall to be funded from <br /> Cable TV Fund 270-4120-910-000 using Cable TV fund balance. <br /> JS/SL <br /> • <br />